A reversible split can go up without an application on many English houses, but a cooling-only unit needs one.

An air conditioning outdoor unit on a ground stand on gravel with its pipe cover rising up a gritstone wall, and an indoor unit above a sofa in a stone cottage living room with a fireplace

Key Takeaways

An air conditioning outdoor unit on a bracket on a red brick wall with the pipe cover running into the house, an indoor unit above the bed in a bedroom with hills beyond the window and a stone cottage behind a dry stone wall and garden gate
  • A split air conditioner that heats as well as cools can be permitted development on a house in England since 29 May 2025, under Class G of Part 14 of the planning rules.
  • A cooling-only unit needs a planning application, according to the government’s Planning Portal.
  • The limits: one outdoor unit on a semi, terrace or block of flats, two on a detached house; up to 1.5 cubic metres on a house and 0.6 on a block of flats; nothing on a pitched roof; and the unit has to pass the MCS 020 a) noise calculation.
  • In a conservation area the unit has to stay off walls and roofs that face a road. A listed building gets no permitted development for a heat pump at all, and the work can need listed building consent too.
  • Inside the Peak District National Park, the National Park Authority decides planning. Outside it, High Peak Borough Council has designated 32 conservation areas, and some of them carry Article 4 directions.
  • Planning is one of three checks. A new electrical circuit falls under Part P, and a split filled with an F-gas such as R32 needs an F-Gas qualified engineer to install it.
In This Guide

For a split air conditioner on a house in England, the answer for many homes is no. Since 29 May 2025 the planning rules for air source heat pumps have covered units that heat as well as cool, so a reversible split can go on your wall as permitted development, with no application, as long as it stays inside the limits on number, size, position and noise. A unit you run for cooling alone sits outside those rules, and so does any unit on a listed building.

Older guides tell you every air conditioner needs planning permission. They were right when they were written, because until 28 May 2025 the rules covered heat pumps used for heating alone. This guide sets out the law for England as we read it on 26 October 2026. Wales and Scotland run their own planning rules, so if you live there, ask your council.

The Rule That Changed On 29 May 2025

A wall mounted indoor unit above the bed in a stone walled loft bedroom, and an outdoor unit on a wall bracket on a rendered house beside a timber gate

Class G before 29 May 2025

Permitted development for heat pumps on homes lives in Class G of Part 14, Schedule 2, of the Town and Country Planning (General Permitted Development) (England) Order 2015. Before 29 May 2025, one of its conditions required the heat pump to be used solely for heating. A split air conditioner that cooled your bedroom in July broke that condition, so you needed to apply.

SI 2025/560: the new condition

The Amendment Order 2025 (SI 2025/560) removed that condition and inserted a new one: the heat pump must not be used solely for cooling. A reversible split is an air-to-air heat pump, so it now sits under Class G, provided you use it to heat as well. Our guide to how air conditioning works explains how one machine does both jobs.

Cooling-only use

The condition talks about use. Read as written, a reversible unit that you only ever run on cool is a unit used solely for cooling. If summer cooling is the only job you want from it, ask your council how it reads that before you rely on permitted development.

The same Order made three more changes that matter on an air conditioning job:

What The 2025 Order Changed

  • A detached house can have two outdoor units, where the old rules allowed one on any building.
  • The outdoor unit on a house can be up to 1.5 cubic metres, up from 0.6.
  • A unit can now sit close to the fence: the one-metre gap from the boundary is no longer a condition.

We read Class G on legislation.gov.uk on 26 October 2026. Its last change is the 2025 one, and the site shows no amendments waiting to come in.

Five Checks For A Reversible Unit On A House

A white outdoor unit on wall brackets on a stone house with its pipe cover running to the eaves, and a wall mounted indoor unit above the bed in a stone walled bedroom with a view of the hills

Class G sets the limits, and a reversible split has to pass all five of these checks to go up without an application. Get them right at the design stage and you avoid paying to move a unit after a letter from the council.

It heats as well as cools

Check the data sheet. A reversible unit lists a heating capacity and a heating efficiency figure alongside its cooling figures. Then plan to use the heating, for the reason in the section above.

One outdoor unit, or two on a detached house

A semi-detached house, a terrace or a block of flats can have one air source heat pump under Class G. A detached house can have two. Count any air-to-water heat pump you already have, because it counts as one of them.

If you want two or three rooms done on a semi, ask for one outdoor unit serving several indoor heads (a multi-split), because a second outdoor box would use a slot the house doesn’t have. Class G counts heat pumps rather than indoor heads, so if your layout is unusual, ask the council before you choose. A wind turbine on the house, or a stand-alone one in the garden, takes Class G away altogether.

The outdoor unit is 1.5 cubic metres or less

The limit covers the outdoor compressor unit and any housing around it: 1.5 cubic metres on a house and 0.6 on a block of flats. Multiply the width, height and depth on the data sheet. A unit 80 cm wide, 55 cm tall and 29 cm deep, for example, comes to about 0.13 cubic metres, under a tenth of the limit for a house.

It stays off pitched roofs and high front walls

The unit can’t go on a pitched roof, or within a metre of the outside edge of a flat roof. Outside conservation areas and World Heritage Sites, it can’t go on a wall that faces a road above ground-floor level. Two duties apply wherever it goes: site it so its effect on the look of the building and on the area is as small as is practical, and remove it once you no longer need it.

It passes the noise test at next door’s window

Class G only applies if the unit complies with MCS 020 a), the sound calculation for permitted development heat pumps. The limit is 37 dB, worked out at a point one metre outside a neighbour’s window or door to a room people live in, using the unit’s full sound rating rather than its quiet mode. MCS warns that an install that fails it can face enforcement action from the council. Our heat pump noise and siting guide walks through the sum, the barriers that count and the reflecting walls that make it harder.

Do I Need Planning Permission?

Answer a few questions about your home in England and the unit you’ve been quoted. The answers follow the Class G rules in this guide, and for your own address the council or the National Park Authority has the final word.

Is the building a listed building?

What kind of home is it?

Does anyone else in the block already have an outdoor unit?

Will the unit heat your home as well as cool it?

Will the unit heat your home as well as cool it?

Is there a wind turbine on the house, or a stand-alone one in the garden?

How many outdoor heat pump units will the house have, counting any air-to-water heat pump you already have?

Multiply the width, height and depth on the data sheet. Does the outdoor unit, with any housing around it, stay within the limit of 1.5 cubic metres on a house or 0.6 on a block of flats?

Will the unit go on a pitched roof, or within a metre of the outside edge of a flat roof?

Is the building in a conservation area?

Where would the outdoor unit go?

Where would the outdoor unit go?

Does the unit pass the MCS 020 a) noise calculation: 37 dB or less one metre outside a neighbour’s window or door to a room people live in, using its full sound rating?

Does the unit pass the MCS 020 a) noise calculation: 37 dB or less one metre outside a neighbour’s window or door to a room people live in, using its full sound rating?

If the unit heats and cools and passes every check outside a conservation area

Permitted development, with no application

Since 29 May 2025 a reversible split that passes these checks can go up without a planning application. Site it so its effect on the look of the building and the area is as small as is practical, and remove it once you no longer need it.

For a binding answer in writing, apply for a lawful development certificate before the work starts. Inside the Peak District National Park, the application goes to the National Park Authority. If the house sits in a World Heritage Site, Class G adds position conditions there as well, so ask the council before you book.

If you live in a flat, read your lease as well. In many leases the outside walls stay with the freeholder, so a hole through one needs the freeholder’s written consent before the work.

Check building regulations, electrics and F-Gas next

If the unit heats and cools and passes every check in a conservation area

Class G can allow it, so ask the council first

Your answers fit the Class G conditions for a conservation area: off any wall or roof facing a road, and no nearer the road than the building. The Planning Portal’s guidance is stricter and says a conservation area address needs permission, and an Article 4 direction can remove the allowance on your street.

Ask your council before you book an installer, or apply for a lawful development certificate for a binding answer in writing. Inside the Peak District National Park, ask the National Park Authority.

If you live in a flat, read your lease as well. In many leases the outside walls stay with the freeholder, so a hole through one needs the freeholder’s written consent before the work.

Read the conservation area rules

If the unit can heat but you’ll only run it on cool

Ask your council how it reads the rule

Class G now says the heat pump must not be used solely for cooling. Read as written, a reversible unit that you only ever run on cool is a unit used solely for cooling, so ask your council how it reads that before you rely on permitted development.

If you live in a flat, read your lease as well. In many leases the outside walls stay with the freeholder, so a hole through one needs the freeholder’s written consent before the work.

Read the rule that changed on 29 May 2025

If the unit only cools

A cooling-only unit needs a planning application

The government’s Planning Portal says a cooling-only system needs an application. You apply to the council for your address, or to the Peak District National Park Authority if the house sits inside the Park, so budget time for its decision before anyone drills a hole.

Swapping to a reversible model of a similar size can be the quicker route, because it brings the job back under Class G and gives you a heated room in winter.

If you live in a flat, read your lease as well. In many leases the outside walls stay with the freeholder, so a hole through one needs the freeholder’s written consent before the work.

Read more on cooling-only units

If you’re not sure whether the unit heats

Check the data sheet first

A reversible unit lists a heating capacity and a heating efficiency figure alongside its cooling figures. If the unit you’ve been quoted shows no heating capacity, budget time for the council’s decision before anyone drills a hole.

If the data sheet does list a heating capacity, go back one question and choose the first answer.

If you live in a flat, read your lease as well. In many leases the outside walls stay with the freeholder, so a hole through one needs the freeholder’s written consent before the work.

If the building is listed

Planning permission and listed building consent

Class G excludes listed buildings, so a heat pump on or beside a listed home needs a planning application. You also need listed building consent for any part of the work that affects the building’s character, and carrying out those works without consent is a criminal offence.

Put the whole route in front of the conservation officer, inside and out: the core hole through the wall, the pipe route and the indoor unit as well as the outdoor box.

If you rent, or live in a flat whose lease keeps the outside walls with the freeholder, you need the landlord’s or freeholder’s written consent before the work as well.

Read the listed building section

If you rent your home

Ask your landlord in writing first

If you rent, the outside wall belongs to your landlord. Ask them in writing before you book a survey, and once they agree, run this check again for the house or flat.

Read the section on flats, leases and rented homes

If your flat sits above a shop

Take it to the council first

The planning definition of a dwellinghouse leaves out buildings that contain flats, and a block of flats has to be made up of flats and nothing else. A flat above a shop falls into neither category, so take it to the council before you plan on permitted development.

Read the section on flats, leases and rented homes

If a neighbour in the block already has an outdoor unit

Your unit needs a planning application

A block of flats can have one heat pump under Class G, and that one covers the whole building. With a neighbour’s outdoor unit already in place, yours needs a planning application.

If you live in a flat, read your lease as well. In many leases the outside walls stay with the freeholder, so a hole through one needs the freeholder’s written consent before the work.

Read the section on flats, leases and rented homes

If you don’t know whether anyone in the block has an outdoor unit

Find out who has the block’s one unit

The planning allowance is one outdoor unit of up to 0.6 cubic metres for the whole block, so check whether a neighbour has used it. If one has, yours needs a planning application. Once you know, start again and answer the question about the block.

Read the section on flats, leases and rented homes

If there’s a wind turbine on the house or in the garden

Class G doesn’t apply

A wind turbine on the house, or a stand-alone one in the garden, takes Class G away altogether. Ask the council about a planning application before you go further.

If the house would have more outdoor units than Class G allows

One outdoor unit too many

A semi or a terrace can have one air source heat pump under Class G and a detached house two, counting any air-to-water heat pump already there. For two or three rooms on a semi, ask for one outdoor unit serving several indoor heads, a multi-split, so the job stays inside the one slot the house has. If an air-to-water heat pump already fills that slot, a split of any kind needs a planning application.

Class G counts heat pumps rather than indoor heads, so if your layout is unusual, ask the council before you choose.

Read about heating the whole house instead

If the outdoor unit is over the size limit

Too big for Class G

A bigger outdoor unit needs a planning application, because a reversible split has to pass every check to go up without one. The limit counts any housing around the unit: 1.5 cubic metres on a house and 0.6 on a block of flats.

Check the sum again before you rule the unit out. A unit 80 cm wide, 55 cm tall and 29 cm deep comes to about 0.13 cubic metres, under a tenth of the limit for a house.

If the unit would go on a pitched roof or near a flat roof’s edge

Keep it off the roof

The unit can’t go on a pitched roof, or within a metre of the outside edge of a flat roof. Left there, it needs a planning application, so find it a place on a wall, at ground level or further back on the flat roof, then start again.

If you don’t know whether the building is in a conservation area

Check your address on the planning map

High Peak Borough Council’s interactive planning map shows whether your address sits in one of its 32 conservation areas and whether an Article 4 direction applies. Inside the Peak District National Park, ask the National Park Authority. Stockport and Manchester each have their own council and their own conservation areas, so ask the council for your address.

Once you know, start again and answer the conservation area question.

See who decides planning around New Mills

If the unit would face a road, or sit nearer the road than the building, in a conservation area

Class G doesn’t allow that position

In a conservation area the unit can’t go on a wall or roof that faces a road, and it can’t sit nearer to a road on the edge of your plot than the part of the building nearest that road. In practice that sends it to the back, or to a side wall that doesn’t face the street. If the front is the only place it can go, ask the council about a planning application.

Read the conservation area rules

If the unit would go above ground floor on a wall facing a road

Move it off the upper front wall

Outside conservation areas and World Heritage Sites, the unit can’t go on a wall that faces a road above ground-floor level. Left there, it needs a planning application, so look at ground-floor level or at a wall that doesn’t face the road.

If the unit fails the noise calculation, or you don’t know yet

Get the noise sum done first

Class G only applies if the unit complies with MCS 020 a), worked out with the unit’s full sound rating rather than its quiet mode. MCS warns that an install that fails it can face enforcement action from the council. If the calculation fails, Class G doesn’t apply, so the unit needs a different position or a planning application.

On a terrace the outdoor unit can end up on a back yard wall close to a neighbour’s window, which makes the calculation harder to pass.

Work through the sum in our heat pump noise and siting guide

A Cooling-Only Unit Needs A Planning Application

The back of a red brick house with garden doors and an air conditioning outdoor unit at the foot of the wall, and an indoor unit above a dining table by glazed doors to the garden

The government’s Planning Portal says permitted development only covers systems that provide heating, including those that heat and cool, and that a cooling-only system needs an application. If the unit you’ve been quoted has no heating capacity on its data sheet, budget time for the council’s decision before anyone drills a hole.

You apply to the council for your address, or to the Peak District National Park Authority if the house sits inside the Park. The council weighs the unit’s position, how it looks and the effect on neighbours. Swapping a cooling-only model for a reversible one of a similar size can be the quicker route, because it brings the job back under Class G and gives you a heated room in winter.

Conservation Areas And The Peak District National Park

An air conditioning outdoor unit on gravel beside a stone barn conversion with tall glazing, and a deep window seat in a stone wall looking out over the hills

A conservation area tightens the position rule. The unit can’t go on a wall or roof that faces a road, and it can’t sit nearer to a road on the edge of your plot than the part of the house nearest that road. In practice that sends it to the back of the house, or to a side wall that doesn’t face the street.

The Planning Portal’s air conditioning answer goes further and says a conservation area address needs permission. Class G itself allows a reversible unit there on the conditions above, and that gap between the guidance and the Order is one more reason to ask your council before you book an installer.

A council can also take permitted development away from particular streets with an Article 4 direction. High Peak Borough Council says some of its conservation areas carry one, and its interactive planning map shows where they apply.

The National Park

The planning rules call National Parks “Article 2(3) land”, in the same list as conservation areas, areas of outstanding natural beauty, the Broads and World Heritage Sites. That label restricts several other kinds of permitted development, but Class G only adds conditions for conservation areas and World Heritage Sites. Inside the Peak District National Park, the National Park Authority is the only local planning authority, so your questions and any application go to it rather than to the borough council.

A binding answer in writing

A lawful development certificate is the council’s formal answer that a planned job would be lawful. You apply before the work starts, and once the council grants one, the law presumes the work lawful unless something material changes before you begin. The council has eight weeks from a valid application to decide, so on an awkward house apply before you book the install. The certificate then stays with the paperwork you hand a buyer when you sell.

An air conditioning outdoor unit on a wall bracket on a red brick house above a lawn, and a wall mounted air conditioning unit in a loft office under a roof window, with a stepladder and tool bag on the floor

Class G excludes listed buildings and scheduled monuments, so a heat pump on or beside a listed home needs a planning application. Listed building consent is a separate decision. You need it for any works that would affect the building’s character as a building of special architectural or historic interest, and the law makes it an offence to carry those works out without consent, with fines or prison on conviction.

An air conditioning job on a listed house reaches further than the outdoor unit. The core hole through a historic wall, the pipe route across a room and the indoor unit on a panelled wall can all touch the building’s character, so put the whole route in front of the conservation officer, inside and out. Show the planning team the layout before you commit, and the installer can design the job around their answer.

Flats, Leaseholds And Rented Homes

An outdoor unit on a ground stand beside a buff brick house, and a wall mounted indoor unit above a home office desk

Blocks of flats

Class G covers two kinds of building: a dwellinghouse, and a block of flats, which the rules define as a building made up of flats and nothing else. A block of flats can have one heat pump, with an outdoor unit up to 0.6 cubic metres. That one covers the whole building, so if a neighbour in the block already has an outdoor unit, yours needs a planning application. The planning definition of a dwellinghouse leaves out buildings that contain flats, so a flat above a shop falls into neither category. If you live in one, take it to the council before you plan on permitted development.

Leasehold flats

In a flat the lease can matter more than planning. Your lease decides who owns the outside walls, and in many leases they stay with the freeholder, so a hole through one needs the freeholder’s written consent. Haringey Council’s lease terms, as one example, list any alteration to the outside of a flat, down to a boiler vent or a satellite dish, as work that needs its permission. If a lease says you need consent for improvements, the Landlord and Tenant Act 1927 stops the landlord refusing it without good reason, though they can ask for reasonable costs.

Rented homes

If you rent, the outside wall belongs to your landlord. Ask them in writing before you book a survey.

Building Regulations, Electrics And F-Gas

The two refrigerant valves on the side of an outdoor unit with insulated pipes running into trunking, and a new air conditioning unit high on the wall of a bright living room, the stepladder still out by the sofa

Building regulations

Planning permission and building regulations are two separate systems, and a fixed air conditioner touches the second one too. The Building Regulations 2010 count air conditioning among “fixed building services”, and their schedule of self-certification schemes includes installing an air conditioning system in a dwelling. GOV.UK lists four competent person schemes authorised for air conditioning work, which let a registered installer self-certify instead of going to building control. If your installer isn’t registered for it, ask your council’s building control team before the job starts.

Electrics

Your engineer also needs power at the unit. Approved Document P lists three kinds of notifiable electrical work: a new circuit, a replacement consumer unit, and additions or alterations to circuits in a special location such as a bathroom. A new circuit for the unit goes through building control, or through an electrician registered with a competent person scheme who self-certifies it.

F-gas

The refrigerant work carries its own law. GOV.UK says installing a new air conditioning or heat pump system that holds an F-gas needs an F-Gas qualification, and that working on F-Gas equipment without one is against the law. Our engineer holds the City & Guilds Level 2 Award in F-Gas and ODS Regulations, Category I, awarded on 23 June 2026, and Category I covers every activity, installation included. Our guide to fitting air conditioning yourself sets out which parts of the job the F-Gas rules reserve for a qualified engineer.

If You Want The Whole House Heated

An air source heat pump on a base at the corner of a brick and stone house, and a wall mounted indoor unit above an open plan lounge and dining room with the garden doors open

The same Class G rules cover an air-to-water heat pump, the kind that feeds radiators and a hot water cylinder. If you are weighing a split for one room against heating for the whole house, the planning checks above apply to either outdoor unit, and on a semi or terrace you can only have one of them under permitted development. Decide which job matters more before you fill the only slot.

An air-to-air system heats the rooms with an indoor unit and leaves your hot water to the boiler. The Boiler Upgrade Scheme lists £7,500 towards an air-to-water heat pump and £2,500 towards an air-to-air one (GOV.UK, read 26 October 2026). The air-to-air grant needs a system that replaces your fossil fuel heating and can meet the home’s full heating and hot water demand, with help from other appliances if needed, so a split for one bedroom beside a gas boiler doesn’t qualify. Grant claims run through MCS certification, and ours is in progress, so ask at the survey for the current position. The heat pump installation page covers the design survey and the room-by-room heat loss, and our air-to-air heat pump guide compares the two systems side by side.

Planning Checks Across Manchester, Stockport And The High Peak

An air conditioning outdoor unit on wall brackets on a stone wall above a gravel border, and an indoor unit above a desk in a home office with leaded windows

Our air conditioning surveys cover Manchester, Stockport, Marple and the High Peak from Glossop and Buxton to Whaley Bridge, and we also survey in towns such as Chesterfield, Matlock and Sheffield. Three different planning set-ups cover the nearer patch.

Who Decides

  • High Peak Borough Council covers the borough outside the National Park, with 32 conservation areas. Its interactive planning map shows whether your address sits in one and whether an Article 4 direction applies.
  • The Peak District National Park Authority decides planning inside the Park. The boundary weaves around High Peak towns and villages, so check your address before you assume which body you deal with.
  • Stockport and Manchester each have their own council and their own conservation areas. Ask the council for your address.

Gritstone terraces and old mill buildings fill this patch, and on a terrace the outdoor unit can end up on a back yard wall close to a neighbour’s window, which makes the noise calculation harder to pass. At the survey our engineer looks at where the outdoor unit can go and checks that spot against the planning rules before the quote names it. If your house needs a planning application or listed building consent, the install waits until you have it. Our local pages cover air conditioning in the High Peak, Glossop, Stockport and Manchester.

When Each Check Has To Happen

What has to be in place at each stage of an air conditioning job, in the order the job reaches it.

  1. 1

    Before you book a survey

    If you rent, ask your landlord in writing, because the outside wall belongs to them.

  2. 2

    Before you book the install

    On an awkward house, apply for a lawful development certificate. The council has eight weeks from a valid application to decide. In a conservation area, ask your council before you book an installer.

  3. 3

    Before anyone drills

    A cooling-only unit or a listed home needs the council’s decision on a planning application, and a listed home needs listed building consent as well. In a flat, the freeholder’s written consent comes first if the lease keeps the outside walls. The install waits until you have each one that applies.

  4. 4

    Before the job starts

    If your installer isn’t registered with one of the four competent person schemes for air conditioning, ask your council’s building control team.

  5. 5

    The install itself

    The refrigerant work needs an F-Gas qualified engineer. The new circuit for the unit goes through building control, or through an electrician registered with a competent person scheme who self-certifies it.

Planning Permission For Air Conditioning: Your Questions

An air conditioning outdoor unit on a flat roof beside a stone extension with hills behind, and a dark indoor unit above a chest of drawers in a bedroom

Do you need planning permission for an air conditioning unit on a house in England?

A reversible split that heats as well as cools needs no application if it meets the Class G limits: the right number of outdoor units, 1.5 cubic metres or less, off pitched roofs and high front walls, no wind turbine on the property, and passing the MCS 020 a) noise calculation. A cooling-only unit or a listed building needs an application.

Do you need planning permission for air conditioning in a conservation area?

Under Class G, a reversible unit can go up without one if it stays off any wall or roof facing a road and no nearer the road than the house. The Planning Portal’s guidance is stricter, and an Article 4 direction can remove the allowance on your street, so check with your council first.

Can you put air conditioning in a listed building?

Yes, with the right permissions. Permitted development doesn’t apply, so you need planning permission, and you need listed building consent for any part of the work that affects the building’s character. Carrying out those works without consent is a criminal offence.

Can I put an air conditioning unit on the front of my house?

Outside a conservation area, yes at ground-floor level, but not above it on a wall that faces a road. In a conservation area, keep it off any wall that faces a road.

Do I need my freeholder’s permission for air conditioning in a flat?

If your lease keeps the outside walls with the freeholder or requires consent for alterations, yes, in writing, before the work. The planning allowance is one outdoor unit of up to 0.6 cubic metres for the whole block, so check whether a neighbour has used it.

Is a portable air conditioner subject to planning permission?

No outdoor unit goes on the wall, so Class G doesn’t come into it. A portable unit vents warm air through a hose at a window, and our installation cost guide compares it with a fixed split.

Does the council or the National Park decide air conditioning planning around New Mills?

The same England rules apply, and the body you ask depends on the address: the Peak District National Park Authority inside the Park, High Peak Borough Council outside it. Our engineer checks the outdoor unit’s position against the rules at the survey, wherever you are in the area we cover.

Lewis Harding, head plumber and gas engineer at First Point Plumbing and Heating, smiling in a black company hoodie

Lewis Harding

Head Plumber and Gas Engineer

Lewis has ten years in the trade. He started on his own, fitting boilers and bathrooms, and has spent the past year on heat pump and system design.

  • Gas Safe 930763
  • F-Gas FGAS3028681
  • Which? Trusted Trader
About Lewis And The Team

Sources

An air conditioning outdoor unit on a bracket on the side wall of a red brick house, and an indoor unit above the sofa in a stone walled living room with a wood burner
  1. The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 14, Class G (latest revised text; versions 15 April 2015 and 29 May 2025; no outstanding effects listed)
  2. The same cross-heading as it stood on 28 May 2025 (the “solely for heating purposes” condition)
  3. The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2025 (SI 2025/560), made 6 May 2025, in force 29 May 2025
  4. GPDO 2015, Schedule 2, Part 14, paragraph P (definitions of “block of flats” and “MCS Planning Standards”)
  5. GPDO 2015, article 2 (definition of “dwellinghouse”)
  6. GPDO 2015, Schedule 1, Part 1 (Article 2(3) land)
  7. MCS 020 a) Air Source Heat Pump Sound Calculation (For Permitted Development Installations), Issue 1.1, 14 April 2025, sections 1.2 to 1.7
  8. Planning Portal, Do I need planning permission to add air conditioning to my home?
  9. Town and Country Planning Act 1990, section 4A (National Park authority as sole local planning authority)
  10. Town and Country Planning Act 1990, section 192 (certificate of lawfulness of proposed use or development)
  11. Planning (Listed Buildings and Conservation Areas) Act 1990, section 7 (consent needed)
  12. Planning (Listed Buildings and Conservation Areas) Act 1990, section 9 (offences)
  13. High Peak Borough Council, Conservation areas
  14. Landlord and Tenant Act 1927, section 19
  15. Haringey Council, Leasehold home alterations
  16. The Building Regulations 2010, regulation 2 (“fixed building services”)
  17. The Building Regulations 2010, Schedule 3, paragraph 6 (up to date to 25 October 2026)
  18. GOV.UK, Competent person scheme: current schemes and how schemes are authorised (updated 17 September 2026)
  19. HM Government, Approved Document P: Electrical safety, dwellings (2013 edition, paragraph 2.5)
  20. GOV.UK, Qualifications to work with F gas (updated 3 March 2026)
  21. GOV.UK, Apply for the Boiler Upgrade Scheme: What you can get
  22. GOV.UK, Apply for the Boiler Upgrade Scheme: Check if you’re eligible
  23. The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2026 (SI 2026/390), in force 28 April 2026, regulation 9(2)(b) and (c)
  24. The Town and Country Planning (Development Management Procedure) (England) Order 2015, article 39(10)(a) (eight weeks to decide a lawful development certificate)

Google Reviews From Our Customers

A First Point engineer in a hi vis waistcoat and blue gloves beside a wall mounted unit with its grille open in an office, and a First Point engineer in a company polo laughing in front of a green shipping container

More Guides

All Guides

Book Your Air Conditioning Survey

Four First Point engineers in black branded polos standing in a row in front of a dark grey crew van

Our engineer looks at the room, the wall and the outside spot, checks the position against the planning rules for your address, and sends a written quote that names the units, the pipe route and the work.