Skip to content
Bathroom installation in High Peak: wet room tiled floor to ceiling in teal gloss metro tile, with a frameless glass screen, a chrome rain head and a plant on the tiled window sill

Bathroom Installation In The High Peak, Planned For The Years You’ll Use The Room

A shower you can walk straight into, a layout with room to move, and pipework sized so the flow holds while a tap runs downstairs. One company plans the room and guarantees the work for two years.

  • Gas Safe Register mark, First Point gas engineer registration 930763
  • F-Gas Register mark, First Point registration FGAS3028681
  • Heat Geek trained
  • Stiebel Eltron certified installer
  • Which? Trusted Trader
Finance through Ideal4Finance

Spread The Cost Of Your Install

  • APR (fixed) 12.9%
  • Loans from £1 to £30,000
  • Finance over 12 to 120 months
  • Ask for finance with your quote
  • We agree any deposit with you before you apply

Representative example: £8,000 purchase, £2,000 deposit, £6,000 credit over 48 months at 12.9% APR (fixed). 48 monthly payments of £160.67. Total repayable £7,712.03. Total cost £9,712.03.

First Point Plumbing & Heating is an Introducer Appointed Representative of Ideal Sales Solutions Ltd, t/a Ideal4Finance. Ideal Sales Solutions Ltd is a credit broker and not a lender (FRN 703401). Finance available subject to status. There are risks involved in taking out a loan and you should ensure you can make all payments on time and in full; failure to do so can lead to financial difficulties and have a negative impact on your credit score.

Bathroom installation in High Peak: illustration of first fix in a stripped bathroom: new copper hot and cold feeds running to a concealed shower valve box chased into the wall, and the waste run clipped back to the stack Bathroom installation in High Peak: illustration of first fix in a stripped bathroom: new copper hot and cold feeds running to a concealed shower valve box chased into the wall, and the waste run clipped back to the stack

A Bathroom Fitted For This Year Can Be Hard Work In Ten

Plenty of High Peak bathrooms still ask you to climb over the side of a bath to get under the shower.

That step is nothing until a knee or a hip starts to object, or a parent moves in with you. Plan the room around a suite in a brochure and you can find yourself pulling the new tiles off a few years later to fit the shower you needed all along.

The trouble with a room planned for looks alone:

  • A bath edge to step over each time you want a shower
  • A tray with a lip that catches a foot or the wheel of a walking frame
  • A shower that drops to a trickle when someone downstairs fills the kettle
  • No space beside the toilet or the basin for someone helping

We plan your bathroom around the people who use it, now and later, and the plan starts with the pipes behind the walls.

A High Peak Bathroom Planned Around The Person Using It

A plumbing and heating company plans the room, so the access, the pressure and the falls get settled before a tile goes on.

  • Level-access wet rooms and accessible layouts, drawn around how that person moves round the room

  • Hot and cold runs sized to the shower you choose, so it keeps its flow while a tap runs elsewhere

  • One number to ring from the first visit to the handover, with our office keeping you updated

  • A workmanship guarantee that runs two years and comes in writing, next to the makers’ warranties

The visit comes first. We measure the room, check the pipe sizes, the boiler or cylinder and the route the waste can take, and the layout and written quote follow from what we find.

Bathroom installation in High Peak: wet room in teal green metro tile, a glass screen, chrome rain head and a potted plant on the window sill Bathroom installation in High Peak: wet room in teal green metro tile, a glass screen, chrome rain head and a potted plant on the window sill

From The Pipes Out, In A High Peak Bathroom

Scroll through the order the room goes together. The floor and the drain for a level shower are set long before the tiles.

  • Pipework Hot, cold and waste runs, sized to your fittings.
  • Backer board The base behind the tiles that water can’t rot.
  • Waterproofing The shower area sealed and the wet room floor laid to fall.
  • Finish Tiles, suite and towel radiator, tested before handover.
Backer Board Waterproofing Suite Floor Towel Rail Waste Tiles Pipework
  1. Pipework Step 1 of 4

    Pipework First

    New supply pipes go in at the bore your shower and taps need, and we check them before anything covers them.

  2. Backer board Step 2 of 4

    A Sound Base Behind The Tiles

    Behind a shower, tiles need a base water can’t rot, such as tile backer board, and your quote names the one going on your walls.

  3. Waterproofing Step 3 of 4

    Waterproofed Where The Water Lands

    Your quote sets out how we seal the shower area before tiling, and a wet room floor slopes to its drain.

  4. Finish Step 4 of 4

    Tiles, Suite And Heat

    Tiling and flooring go down, then the suite, the brassware and the towel radiator go in, and we test them before you take the room back.

The finished room

Pipework checked before it is covered, and every fitting tested before you take the room back.

Trusted By Homeowners Across The High Peak

Rated 4.9 stars on Google, with bathrooms, showers and boilers among the jobs our customers review.

What A High Peak Bathroom Installation Includes

Seven stages, one written price, and the same company from the measuring visit to the handover.

  1. Visit and Measure

    We measure the room and check the supply, the boiler or cylinder and the waste route before we price anything.

    Illustration of a dated but tidy bathroom before the refit, with peach tiles, a bath with an over-bath shower and a pedestal basin
  2. Strip-out

    The old suite, tiles and boxing come out before any new work starts.

    Illustration of the same bathroom stripped back to bare plaster, with the pipe ends capped and boards laid over the floor
  3. Dust and Carpets

    The quote covers how we protect the rest of the house: the carpets, the furniture and where the dusty work happens.

    Illustration of an upstairs landing by the bathroom, with protective film laid over the carpet and a dust sheet over the chest of drawers
  4. First Fix

    New pipework and waste runs, sized to the fittings you chose.

    Illustration of first fix in the stripped bathroom: copper feeds to a concealed shower valve, a floor drain and the waste runs
  5. Walls and Floor

    Boarding, waterproofing and tiling, wall to floor.

    Illustration of tile backer boards fixed to every wall, with a waterproof tanking membrane over the shower area
  6. Second Fix

    Suite, brassware, shower and towel radiator fitted and tested.

    Illustration of the finished wet room with a frameless glass screen, a rain shower, an oak vanity unit, a wall-hung toilet and a towel radiator
  7. Handover

    The room left clean, the controls and fittings explained, and your guarantee confirmed in writing.

    Illustration of a bright finished family bathroom in a detached stone house, with a freestanding bath, a walk-in shower and a sunlit window
Illustration of a dated but tidy bathroom before the refit, with peach tiles, a bath with an over-bath shower and a pedestal basin Illustration of the same bathroom stripped back to bare plaster, with the pipe ends capped and boards laid over the floor Illustration of an upstairs landing by the bathroom, with protective film laid over the carpet and a dust sheet over the chest of drawers Illustration of first fix in the stripped bathroom: copper feeds to a concealed shower valve, a floor drain and the waste runs Illustration of tile backer boards fixed to every wall, with a waterproof tanking membrane over the shower area Illustration of the finished wet room with a frameless glass screen, a rain shower, an oak vanity unit, a wall-hung toilet and a towel radiator Illustration of a bright finished family bathroom in a detached stone house, with a freestanding bath, a walk-in shower and a sunlit window
Bathroom installation in High Peak: engineer high on a ladder in a narrow alley between two walls, feeding a pipe run up towards the roofline

An Older Borough, And Bathrooms That Have To Keep Up With It

At the 2021 Census, 21.8% of High Peak residents were 65 or over, against 18.4% across England, and the borough’s median age had climbed from 43 to 46 in ten years.

If you’re refitting a bathroom you expect to use for the next twenty years, those figures point at two questions worth asking now: can you get into the shower without a step, and is there room to turn round in there. We’d rather settle both at the visit, while they’re lines on a plan, than after the new tiles are up.

  • A level-access shower in place of the bath, where the floor and the waste route allow it

  • Space beside the toilet and basin for a walking frame or a second pair of hands

  • Underfloor heating, so a tiled floor stays warm under bare feet

  • Pressure at the shower, sized from the supply your house has

Bathroom installation in High Peak: two chrome crosshead pillar taps on a white basin against white bevelled metro tile, with a deep whitewashed window reveal and greenery outside Bathroom installation in High Peak: two chrome crosshead pillar taps on a white basin against white bevelled metro tile, with a deep whitewashed window reveal and greenery outside Bathroom installation in High Peak: two chrome crosshead pillar taps on a white basin against white bevelled metro tile, with a deep whitewashed window reveal and greenery outside

Three Figures To Hold Against Any Other Bathroom Quote

Two describe the company, and one describes the borough you live in.

Any work the room needs beyond the bathroom itself, such as a boiler moved to free up space, goes into the same quote before anything starts.

  • 2 years
    workmanship guarantee on your bathroom, in writing
  • 4.9
    our rating on Google, from 47 reviews
  • 21.8%
    of High Peak residents aged 65 or over at the 2021 Census

Four Doubts To Settle Before A Wet Room Goes Into Your High Peak Home

Straight answers on looks, pressure, aftercare and distance.

Illustration of a finished level-access wet room: a frameless glass screen, a chrome rain head and a heated towel rail, with sunlight across the tilesIllustration
  • Will an accessible bathroom end up looking like a hospital?

    The layout starts with how that person moves round the room, and the look follows what you like, as it does on any bathroom we plan. Our gallery has walk-in showers in rooms you’d want to spend time in.

  • Will a walk-in shower upstairs still have decent pressure?

    We size the hot and cold runs to the shower you pick and check your hot water supply at the visit. If the supply falls short of the shower you want, you hear about it there, before you’ve spent anything.

  • If I use an internet company, who fixes it if it breaks next week?

    We do. The same team stays on your room until it’s finished, we come back the same week if something needs a look afterwards, and the workmanship is guaranteed for two years.

  • The High Peak is a big place. Will you come out to us?

    Yes. We fit bathrooms from Glossop down to Buxton, through Chapel-en-le-Frith and Whaley Bridge, and over the county line into Marple and Disley.

A First Point engineer in a black hoodie against the white van, the Gas Safe decal at the bottom right A First Point engineer in a black hoodie against the white van, the Gas Safe decal at the bottom right

Our Guarantees On Your Bathroom, In Writing

One company stands behind the room, so you know who to call if anything goes wrong.

  • 2-year workmanship guarantee on the installation, running alongside the manufacturer warranties on the suite and fittings

  • A same-week return if anything needs a look after you move back in

  • Gas Safe registered 930763, for the boiler and gas work that sometimes comes with a new bathroom

  • A written quote before any work starts, with the start date in it

  • A single company answerable for the whole room, start to finish

Bathroom Installation In The High Peak: Timing, Access And Heating

Your written quote names the start date and the number of working days for your room, so you can plan around them before you agree. A wet room or a change of layout takes longer than swapping the suite in the same positions, and the quote reflects that.

Yes. Level-access wet rooms and accessible layouts are part of our bathroom work. At the visit we check the floor and the waste route, because a wet room floor has to fall to its drain, and we plan the layout around the person who will use it.

Yes. We fit underfloor heating as part of our heating work, and the visit checks your floor build-up and how the system would run from your boiler or heat pump.

We cover the borough, including Glossop, Buxton, Chapel-en-le-Frith, Hayfield and Whaley Bridge. Our home town has its own page for bathroom installation in New Mills, and the way we plan each room sits on our main bathroom installation page.

Tell Us About The Bathroom And Who Uses It

The room, what’s in it now and anything the new layout has to allow for. Our office replies within one working day.

Reviews From Across The High Peak