Skip to content
Bathroom installation in Marple: wet room tiled floor to ceiling in teal gloss metro tile, with a frameless glass screen, a chrome rain head and a plant on the tiled window sill

Bathroom Installation In Marple, With The Start Date And The Working Days In Writing

One company answers for the whole room, from the strip-out to the towel radiator, on dates you agree before work starts. Pipework sized to your shower and a two-year workmanship guarantee come with it.

  • Gas Safe Register mark, First Point gas engineer registration 930763
  • F-Gas Register mark, First Point registration FGAS3028681
  • Heat Geek trained
  • Stiebel Eltron certified installer
  • Which? Trusted Trader
Finance through Ideal4Finance

Spread The Cost Of Your Install

  • APR (fixed) 12.9%
  • Loans from £1 to £30,000
  • Finance over 12 to 120 months
  • Ask for finance with your quote
  • We agree any deposit with you before you apply

Representative example: £8,000 purchase, £2,000 deposit, £6,000 credit over 48 months at 12.9% APR (fixed). 48 monthly payments of £160.67. Total repayable £7,712.03. Total cost £9,712.03.

First Point Plumbing & Heating is an Introducer Appointed Representative of Ideal Sales Solutions Ltd, t/a Ideal4Finance. Ideal Sales Solutions Ltd is a credit broker and not a lender (FRN 703401). Finance available subject to status. There are risks involved in taking out a loan and you should ensure you can make all payments on time and in full; failure to do so can lead to financial difficulties and have a negative impact on your credit score.

Bathroom installation in Marple: wet room in teal green metro tile, a glass screen, chrome rain head and a potted plant on the window sill Bathroom installation in Marple: wet room in teal green metro tile, a glass screen, chrome rain head and a potted plant on the window sill

When Your Only Bathroom Is Stripped Out, A Slipping Finish Date Hurts

The plumber finishes on Tuesday, the tiler is stuck on another job until the week after, and the room sits in bare plaster while you wait.

Book separate trades for one room and the dates belong to them. You end up chasing, and the household queues for a downstairs sink.

Three questions to put to anyone who quotes for your bathroom:

  • Does the quote give a start date and the number of working days?
  • Who do you ring when one of the trades doesn’t turn up?
  • Who answers for a leak behind the tiles a year from now?

Our written quote answers all three before anything comes off the walls.

Bathroom Fitters In Marple, With One Number From Visit To Handover

You deal with one company from the measuring visit to the handover, and we book the work on your room.

  • A start date and a number of working days in your written quote, before you agree

  • One number to ring the whole way through, and our office keeping you updated

  • Pipework sized to the shower you pick, so the flow holds when the kitchen tap goes on

  • Our work on the room guaranteed for two years, with the makers’ warranties on the suite as well

The chasing is our job. You get the dates on paper and one company answerable for the room once it’s finished.

Bathroom installation in Marple: illustration of first fix in a stripped bathroom: new copper hot and cold feeds running to a concealed shower valve box chased into the wall, and the waste run clipped back to the stack Bathroom installation in Marple: illustration of first fix in a stripped bathroom: new copper hot and cold feeds running to a concealed shower valve box chased into the wall, and the waste run clipped back to the stack

How A Marple Bathroom Goes Together, Day By Day

Scroll through the four layers in the order we fit them, the order your quote’s working days follow.

  • Pipework Hot, cold and waste runs, sized to your fittings.
  • Backer board The base behind the tiles that water can’t rot.
  • Waterproofing The shower area sealed and the wet room floor laid to fall.
  • Finish Tiles, suite and towel radiator, tested before handover.
Backer Board Waterproofing Suite Floor Towel Rail Waste Tiles Pipework
  1. Pipework Step 1 of 4

    Pipework First

    New supply pipes go in at the bore your shower and taps need, and we check them before anything covers them.

  2. Backer board Step 2 of 4

    A Sound Base Behind The Tiles

    Behind a shower, tiles need a base water can’t rot, such as tile backer board, and your quote names the one going on your walls.

  3. Waterproofing Step 3 of 4

    Waterproofed Where The Water Lands

    Your quote sets out how we seal the shower area before tiling, and a wet room floor slopes to its drain.

  4. Finish Step 4 of 4

    Tiles, Suite And Heat

    Tiling and flooring go down, then the suite, the brassware and the towel radiator go in, and we test them before you take the room back.

The finished room

Pipework checked before it is covered, and every fitting tested before you take the room back.

Trusted By Homeowners Across The High Peak

Rated 4.9 stars on Google, with bathrooms, showers and boilers among the jobs our customers review.

What Your Marple Bathroom Installation Includes

Seven stages under one written quote, with one company answerable for every one of them.

  1. Visit and Measure

    We measure the room and check the supply, the boiler or cylinder and the waste route before we price anything.

    Illustration of a dated but tidy bathroom before the refit, with peach tiles, a bath with an over-bath shower and a pedestal basin
  2. Strip-out

    The old suite, tiles and boxing come out before any new work starts.

    Illustration of the same bathroom stripped back to bare plaster, with the pipe ends capped and boards laid over the floor
  3. Dust and Carpets

    The quote covers how we protect the rest of the house: the carpets, the furniture and where the dusty work happens.

    Illustration of an upstairs landing by the bathroom, with protective film laid over the carpet and a dust sheet over the chest of drawers
  4. First Fix

    New pipework and waste runs, sized to the fittings you chose.

    Illustration of first fix in the stripped bathroom: copper feeds to a concealed shower valve, a floor drain and the waste runs
  5. Walls and Floor

    Boarding, waterproofing and tiling, wall to floor.

    Illustration of tile backer boards fixed to every wall, with a waterproof tanking membrane over the shower area
  6. Second Fix

    Suite, brassware, shower and towel radiator fitted and tested.

    Illustration of the finished wet room with a frameless glass screen, a rain shower, an oak vanity unit, a wall-hung toilet and a towel radiator
  7. Handover

    The room left clean, the controls and fittings explained, and your guarantee confirmed in writing.

    Illustration of a bright finished family bathroom in a detached stone house, with a freestanding bath, a walk-in shower and a sunlit window
Illustration of a dated but tidy bathroom before the refit, with peach tiles, a bath with an over-bath shower and a pedestal basin Illustration of the same bathroom stripped back to bare plaster, with the pipe ends capped and boards laid over the floor Illustration of an upstairs landing by the bathroom, with protective film laid over the carpet and a dust sheet over the chest of drawers Illustration of first fix in the stripped bathroom: copper feeds to a concealed shower valve, a floor drain and the waste runs Illustration of tile backer boards fixed to every wall, with a waterproof tanking membrane over the shower area Illustration of the finished wet room with a frameless glass screen, a rain shower, an oak vanity unit, a wall-hung toilet and a towel radiator Illustration of a bright finished family bathroom in a detached stone house, with a freestanding bath, a walk-in shower and a sunlit window
Bathroom installation in Marple: a First Point engineer sitting in the open back of a racked out van, with hose, drain rods and tool crates on the shelving behind him

Post-War Semis, And One Bathroom For The Whole House

Valuation Office records date 48% of homes in Marple and Rose Hill, and 54% in Marple and Hawk Green, to between 1945 and 1982, with semis the commonest type in both.

If yours is a semi from those years with one bathroom upstairs, the weeks that room is out of use touch the whole household, from the school run to a parent staying over. A date that slips by a week is a week of washing at the kitchen sink.

  • Dates you can work round, written into the quote before you agree

  • The hot water: a bigger shower can ask more of your boiler or cylinder than the old one did, and we check it at the visit

  • The space: if the boiler has to move to free up room, that work sits in the same quote

Bathroom installation in Marple: two chrome crosshead pillar taps on a white basin against white bevelled metro tile, with a deep whitewashed window reveal and greenery outside Bathroom installation in Marple: two chrome crosshead pillar taps on a white basin against white bevelled metro tile, with a deep whitewashed window reveal and greenery outside Bathroom installation in Marple: two chrome crosshead pillar taps on a white basin against white bevelled metro tile, with a deep whitewashed window reveal and greenery outside

Marple In Three Numbers, From Our Side Of The Job

A same-week return, a guarantee in writing and the rating our customers give us.

  • Same week
    return visit if a problem shows after handover
  • 2 years
    workmanship guarantee on the room, in writing
  • 4.9
    stars on Google, from 47 customer reviews

Four Doubts To Clear Before Your Marple Bathroom Comes Out

Cost, dust, pressure and what happens after we leave.

Illustration of a finished level-access wet room: a frameless glass screen, a chrome rain head and a heated towel rail, with sunlight across the tilesIllustration
  • Can we use our own tiler to bring the price down?

    We don’t split a room. Another trade’s tiles would sit on our waterproofing, and if one failed neither of us could prove whose work it was, so we fit the room end to end and guarantee all of it.

  • Will the rest of the house be covered in dust?

    Protecting the house is written into your quote, from the carpets and the furniture to the rooms where we do the dusty work.

  • Our shower is weak now. Will a new one be any better?

    A new shower performs as well as the supply behind it, so the visit looks at both: the runs to the bathroom, which we size to the shower you choose, and the boiler or cylinder that heats the water. If they can’t feed the shower you want, you hear it before you spend anything.

  • Who do we call if something goes wrong after you’ve left?

    Our office, on the same number you used all job. A problem after handover gets a return visit the same week.

A First Point engineer in a black hoodie against the white van, the Gas Safe decal at the bottom right A First Point engineer in a black hoodie against the white van, the Gas Safe decal at the bottom right

Our Guarantees On Your Bathroom, In Writing

One company stands behind the room, so you know who to call if anything goes wrong.

  • 2-year workmanship guarantee on the installation, running alongside the manufacturer warranties on the suite and fittings

  • A same-week return if anything needs a look after you move back in

  • Gas Safe registered 930763, for the boiler and gas work that sometimes comes with a new bathroom

  • A written quote before any work starts, with the start date in it

  • A single company answerable for the whole room, start to finish

Marple Bathroom Installation: Dates, Areas And Guarantees

It depends on the room and how much of the layout changes. You see the number of working days and the start date in your written quote, before you agree.

Yes. They’re all a few minutes from central Marple, and the same team fits them. Mellor, up the hill from Marple Bridge, has its own page for bathroom installation in Mellor.

Yes. Our two-year workmanship guarantee covers the way we fitted the room, and it runs alongside the manufacturers’ warranties on the suite and fittings.

One team works on your room from strip-out to handover, with our office as your contact for dates and updates. Our main bathroom installation page explains how we plan each room before that team arrives.

Tell Us About Your Marple Bathroom

The room, what’s in it now and when you’d like the work done. Our office replies within one working day.

What Our Customers Say On Google