Skip to content
Heat pump installation in the High Peak: a Stiebel Eltron air source heat pump on a concrete plinth beside a detached house and a striped lawn, its pipework running into the wall and an isolator switch beside it

Heat Pump Installation Across The High Peak, Designed House By House

From a Buxton terrace to a farmhouse in the Hope Valley, your heat pump gets sized to your own rooms, with the planning position checked and the running cost on paper before you commit.

  • Gas Safe Register mark, First Point gas engineer registration 930763
  • F-Gas Register mark, First Point registration FGAS3028681
  • Heat Geek trained
  • Stiebel Eltron certified installer
  • Which? Trusted Trader
Finance through Ideal4Finance

Spread The Cost Of A Heat Pump

  • APR (fixed) 12.9%
  • Loans from £1 to £30,000
  • Finance over 12 to 120 months
  • Ask for finance with your heat pump quote
  • We agree any deposit with you before you apply

Representative example: £8,000 purchase, £2,000 deposit, £6,000 credit over 48 months at 12.9% APR (fixed). 48 monthly payments of £160.67. Total repayable £7,712.03. Total cost £9,712.03.

First Point Plumbing & Heating is an Introducer Appointed Representative of Ideal Sales Solutions Ltd, t/a Ideal4Finance. Ideal Sales Solutions Ltd is a credit broker and not a lender (FRN 703401). Finance available subject to status. There are risks involved in taking out a loan and you should ensure you can make all payments on time and in full; failure to do so can lead to financial difficulties and have a negative impact on your credit score.

What a High Peak heat pump survey checks: an anthracite unit on gravel and a radiator under a stone window

A Heat Pump In The Wrong Place Won’t Heat The House, However Good The Unit

You want to know a heat pump will keep a High Peak house warm, and that the installer will still answer the phone once it is in.

A heat pump in the wrong place, or sized by guesswork, will let a house down.

We recently turned down a job where the owner had two small heat pumps in his loft. He wanted the new one fitted up there too, breathing the same enclosed air.

The worries we hear most:

  • “Do heat pumps actually work up here?”
  • “Will a small company actually turn up and stand behind it?”

You get the design, the planning position and the price in writing before any work starts.

Design First, Price Second, Wherever You Live In The High Peak

One company runs the job from the survey to the first service, so you explain your house once. Each year after that, we come back for heat pump servicing in the High Peak, anywhere from Glossop down to Buxton.

  • Designed to a target SCOP of 3.5 to 4.0 where the house allows it, with the figure your design reaches written into your quote

  • If a heat pump is wrong for your house, we tell you before you spend a penny

  • The survey is a measurement visit, with no salesperson attached

  • Installation work carries a 2-year workmanship guarantee alongside the manufacturer’s warranty

High Peak heat pump design: our heat pump on a bracket, an engineer in our hoodie and an engineer with his tool belt

Heat Loss First, Hardware Second: How Your High Peak System Is Sized

Each part arrives in the order the design picks it, starting from the heat your house loses.

  1. Your House Sets The Size

    Room-by-room heat loss calculation first, on our own measurements.

    • Stone Wall
    • Wall Bracket
    • Base Tray
    • Coil
    • Fan Motor
    • Fan
  2. Then The Unit Is Chosen

    The outdoor unit is picked to match the figure your house produced rather than a standard size.

    • Compressor
    • Front Panel
    • Fan Guard
    • Top Panel
  3. Emitters And Pipework Sized With It

    Underfloor loops only where the number calls for them, and the design names which radiators grow.

    • Refrigerant Lines
    • Flow Pipe
    • Return Pipe
  4. Commissioned To The Numbers

    Proved on site against the same design figures, with the warranty registered in your name.

    • Service Panel
    • Controls
    • Cable

Inside A First Point Heat Pump Installation

Six parts to the job, on one fixed price from one company, each listed in your quote.

  1. The Survey

    A free visit from our lead engineer to measure the house room by room.

    High Peak heat pump install, step 1: an engineer running pipe, a heat scan in a hallway and an engineer on site
  2. The Design, Written Down

    A target SCOP, and the hardware chosen to reach it, from the unit to the flow rates, with the running-cost workings attached.

    High Peak heat pump install, step 2: cylinder valves and a gauge and a hallway thermostat
  3. The Fixed Price

    The number on the quote stays the number on the invoice.

    High Peak heat pump install, step 3: an engineer by our van, an engineer at a garden gate and a floor plan and quote sheet
  4. The Install

    Fitted by the team that designed it, with bigger radiators only in the rooms the maths picks out.

    High Peak heat pump install, step 4: pipes through a sealed wall sleeve and a unit on a stone patio
  5. Commissioning

    Flow temperatures proved against the design figures on site.

    High Peak heat pump install, step 5: a white unit by a rendered house and a unit by a timber-clad house
  6. Handover

    Your warranty registered in your name, the controls walked through, and a reminder before the first service.

    High Peak heat pump install, step 6: an underfloor heating manifold and a unit by a stone farmhouse

Virotherm is the underfloor we lay when the design asks for it.

High Peak heat pump install, step 1: an engineer running pipe, a heat scan in a hallway and an engineer on site High Peak heat pump install, step 2: cylinder valves and a gauge and a hallway thermostat High Peak heat pump install, step 3: an engineer by our van, an engineer at a garden gate and a floor plan and quote sheet High Peak heat pump install, step 4: pipes through a sealed wall sleeve and a unit on a stone patio High Peak heat pump install, step 5: a white unit by a rendered house and a unit by a timber-clad house High Peak heat pump install, step 6: an underfloor heating manifold and a unit by a stone farmhouse
Heat pump options for High Peak homes: our wall-hung heat pump, a unit behind a brick semi and a unit by a stone wall

Two Planning Authorities Across The High Peak, Checked For Your Address

Your address decides who handles planning: High Peak Borough Council outside the Park, with 32 conservation areas, or the Peak District National Park Authority inside it.

Every heat pump is sized from a survey of your rooms and priced on paper first. Each town we cover has its own page: Chapel-en-le-Frith, Chinley, Disley, Furness Vale, Hayfield, Marple, Mellor, New Mills and Whaley Bridge.

The survey settles four things for your address before we price the job, so planning is answered before you commit a penny:

  • The planning authority: the borough council, or the Park Authority

  • Conservation area status, which keeps the unit off any wall or roof facing the road and no nearer the road than the house

  • Listing, which removes permitted development, so consent comes first

  • The fuel you heat with today, which sets the grant rate and the running cost your quote compares against

The Honest Numbers, Before Any High Peak Survey

Three figures to weigh a heat pump against your boiler, from Glossop to Buxton.

  • 3.5 to 4.0
    Target SCOP, where the house allows it
  • £7,500
    Boiler Upgrade Scheme grant. £9,000 for off-gas oil and LPG homes until 31 March 2027.
  • 83%
    of Victorian-or-older home owners satisfied (Nesta owner survey)
Heat pump figures for the High Peak: an engineer on a scaffold, a First Point engineer and a cylinder and buffer tank

Cost per unit, October to December 2026 price cap

  • Electricity per kWh
    26.32p
  • Gas per kWh
    7.97p

Source: Ofgem, energy price cap unit rates, GB average paying by Direct Debit, checked 24 September 2026.

SCOP 3.3
The 3.3 Line A High Peak Heat Pump Has To Clear

Electricity at 26.32p a unit against gas at 7.97p puts the break-even at a seasonal efficiency of 3.3.

We design to a target SCOP of 3.5 to 4.0 where the house allows it, with the figure your design reaches written into your quote.

Electricity carries no VAT from 1 October 2026 to 31 March 2027 while gas still carries 5%. Once VAT returns, the break-even rises to about 3.5.

On oil or bottled gas, we run the comparison against your own bills at the survey.

“It’s just warm all the time”

Hear firsthand from our customer Fraser about how installing a heat pump has transformed his day to day living.

We’ve turned his cold 18th-century end terrace house into a comfortable, efficient home. No more waiting for the boiler to heat up the house in the morning.

Fraser’s property now sits at a consistent 19°C all year round.

Fraser, heat pump customer

The Doubts High Peak Homeowners Should Settle First

Illustration of a bare stone house wall, before the heat pump brackets and unit are fittedIllustration of a Stiebel Eltron heat pump fitted on galvanised wall brackets against a stone wall, with its pipework run down the wall.Visualisation
Visualisation of a typical air source heat pump installation on wall brackets. Not footage of a real job.
  • Will a heat pump work in an old stone house?

    Nesta’s survey of heat pump owners, more than 2,500 of them, put satisfaction in Victorian or older homes at 83%, the same as in new builds. Stone walls need their heat loss calculated from real measurements, and our survey begins with them.

  • Will it cost more to run than gas?

    Below a SCOP of 3.3 it would. Your design shows the SCOP it reaches and the running cost that follows, so you can compare before you sign anything. Once VAT returns to electricity in April 2027, that line rises to about 3.5.

  • Will my radiators need replacing?

    Some may grow and the rest stay. The design lists each one by room, and the quote prices those changes alone.

  • Does a heat pump need solar and a battery to work?

    It works without them. We add solar panels and a battery to a design when the numbers for your roof and your usage back them up, and leave them out when they don’t.

Can I get the grant?

The Boiler Upgrade Scheme takes £7,500 off an eligible air source or ground source heat pump. Off-gas homes replacing oil or LPG heating get £9,000 instead, on applications made by 31 March 2027.

Grant claims run through MCS certification and ours is in progress. Ask at the survey and you get the current position, explained straight.

High Peak Heat Pump Questions, Answered Before The Survey

Yes. Under the national rules the Park itself adds no heat pump restriction; a conservation area or a listed building is what changes things. The Peak District National Park Authority decides any application inside the Park, and the survey tells you whether you need one.

Siting is part of the design, with the unit kept clear of bedroom windows on both sides of the fence. Permitted development hangs on the MCS Planning Standards too, and their sound calculation starts from the distance between the unit and the closest neighbouring window.

We need your heat loss and your current oil use first. The survey gathers both, and the comparison comes back in writing with the design.

Our patch runs New Mills, Whaley Bridge, Chapel-en-le-Frith, Buxton, Glossop, Hayfield, Marple and Disley. Two of the town pages: heat pumps in New Mills and heat pumps in Chapel-en-le-Frith.

We do, and you get a reminder when it falls due. Our heat pump servicing page walks through that visit.

From one week to one month, set by the size of the house and how much the system covers. The dates and the disruption go into your quote, so you know both before you say yes. Our heat pump installation page sets out the design method in full.

Tell Us About The House And Where It Is

Add the job, the town and a way to reach you. Our office books your survey with the lead engineer.

Reviews From Across The High Peak