How Do Solar Panels Work On A House In Manchester, Sheffield Or Leeds, And Where Does A Battery Fit?
A 4 kWp array in New Mills makes about 14.5 kWh on a June day but only 3 kWh in December, so a battery’s job shifts.

Key Takeaways

- Silicon cells release electrons when light falls on them, and an electric field built into each cell pushes those electrons round a circuit as direct current (US Department of Energy).
- The inverter converts direct current into the alternating current your home runs on. A string inverter serves a whole run of panels, microinverters or optimisers handle each panel, and a hybrid inverter runs a battery as well.
- Your home uses solar power first. Surplus fills a battery, then goes to the grid, where a Smart Export Guarantee supplier pays for it once the installation and installer hold MCS or equivalent certification and a meter records exports half-hourly.
- A battery fills from surplus solar and empties when the house needs more than the roof makes. On a tariff with cheap hours it can also fill from the grid overnight, which keeps it working through winter.
- Your network operator has to know about the system. The inverter’s rating and the number of generating units in the house decide between a notice within 28 days of commissioning (G98) and an application before fitting (G99).
- On a south roof in New Mills, a 4 kWp array makes about 14.5 kWh on an average June day and about 3 kWh on an average December day (PVGIS).
In This Guide
A solar panel turns daylight into electricity inside thin slices of silicon. The panels make direct current, an inverter converts it into the alternating current your sockets use, and that supply joins your home’s wiring at the consumer unit, beside the grid. Your house uses the solar power first, a battery takes the surplus if you have one, and anything left flows out to the grid through your meter.
After dark the flow runs the other way. The battery hands back what it stored during the day, and the grid covers the rest, as it did before the panels went up.
From Light To Current: The Photovoltaic Effect In Plain English

A solar cell is a thin wafer of silicon, a semiconductor. Manufacturers treat each face of the wafer so the two sides carry opposite electrical charges, and the boundary between them sets up an electric field inside the cell. Light falling on the silicon hands its energy to electrons, and the field drives those loose electrons one way: out through the fine metal lines printed on the cell’s face and round whatever circuit you connect. The US Department of Energy describes the treated wafer as a diode, which lets current pass in one direction.
That one-way current is direct current (DC), the kind a torch battery gives. A single cell makes very little, so a panel wires dozens of them together. Take one current example from the maker’s range, SolarWatt’s Panel vision M 5.5: SolarWatt lists it from 465 Wp with 96 half-cut cells. Your written design names the exact panel.
Panel ratings come from a factory test with 1,000 W of light on each square metre. The M 5.5 measures 1,762 mm by 1,134 mm, about 2 m², so in that test it turns about 23% of the light reaching it into electricity, by our arithmetic. The US Department of Energy puts the theoretical ceiling for a silicon cell at about 32%.
Your roof sees test-strength light on few days of the year. The European Commission’s PVGIS tool gives an average of about 540 W per square metre at midday in June on a south-facing roof pitched at 35° in New Mills, and about 190 W at midday in December. Allow PVGIS’s standard 14% for system losses and a 4 kWp array on that roof averages a little under 2 kW at a June midday and about 0.65 kW at a December one.
More light, more current
Output rises and falls with the light on the panel through the day.
Angle and direction
PVGIS gives an east or west slope at 35° in New Mills about 695 kWh per kWp a year, a fifth less than the 853 a south slope makes (our guide to solar panels on slate and north-facing roofs works through direction).
Cloud
Cloud lowers output without stopping it; our guide on whether solar and battery storage is worth it covers cloudy days in the Peak District.
How Do Solar Panels Work On A House? The Route From Roof To Socket

Follow the power from the slates to the kettle and it passes through eight pieces of kit, numbered as in the diagram above.
Panels
Rails and roof hooks hold the panels to the rafters. The panels in each run connect in series, so their voltages add up.
DC cable and isolator
Cables bring the direct current down through the roof to a switch that lets an engineer cut the panels off before working on anything downstream.
Inverter
The inverter converts DC into AC that matches the grid. Which? notes that inverters often sit in the loft, where heat can affect them, and that a garage can suit better.
Generation meter
A meter on the inverter’s output counts each kWh the panels make, wherever that unit goes next. Its reading lets you check the system against the yearly figure in your design.
Consumer unit
The solar supply joins your circuits through its own breaker in the fuse box. Which? advises checking that breaker first if the system stays off after a power cut.
Your lights and sockets
Appliances running at that moment take the solar power first, and the grid tops up anything the roof can’t cover.
Smart meter
Your meter records what you buy from the grid. A smart meter also records what you send out in half-hour slots, which an export tariff needs (GOV.UK).
The grid
Surplus that the house and any battery can’t take flows out onto the local network.
Panels make nothing after dark (Which?), so at night your home runs on the battery and then the grid. You don’t switch anything over at dusk or dawn: the inverter starts and stops with the light.
The Route At Midday, After Dark And In A Power Cut
Pick a moment to see how power moves through the eight numbered parts above.
Midday
The panels (1) make direct current, and it runs through the DC cable and isolator (2) to the inverter (3), which converts it to AC. The generation meter (4) counts each kWh on its way to the consumer unit (5).
Your lights and sockets (6) take what they need first. A battery, if you have one, fills from the surplus, and anything left leaves through the smart meter (7) to the grid (8). The smart meter records that export in half-hour slots, which an export tariff needs.
Evening
As the light fades, the house starts drawing more than the roof makes. A battery covers the gap. Once the battery runs low, or if you have none, the grid tops up the rest and your smart meter (7) records the units you buy.
Night
The panels make nothing after dark. The house runs on the battery if you have one, then on the grid, as it did before the panels went up. On a tariff with cheap overnight hours, the battery can also fill from the grid during them.
Power Cut
A standard grid-connected system switches off when the grid goes down, even in full sun. The network rules require loss-of-mains protection that disconnects it, so it can’t feed power onto the street’s cables during the cut.
GOV.UK’s Be Ready guidance says some solar and battery installations with backup capability can keep supplying power in a cut, if they are designed and configured to run apart from the grid. If backup matters to you, ask for it at the design stage.
If your system stays off after a power cut, Which? advises checking its own breaker in the consumer unit (5) first.
String Inverters, Microinverters, Optimisers And Hybrid Inverters

A solar inverter is the box that turns the panels’ direct current into the alternating current your home and the grid use. Four designs do that job, and the shade on your roof and any plan for a battery decide between them.
| Design | Where it sits | Suits | Watch for |
|---|---|---|---|
| String inverter | One unit, often in the loft or garage, fed by one or more runs of panels | Unshaded roofs with the panels facing one way | One shaded or failing panel drags down its whole run (Which?) |
| Microinverters | A small inverter behind each panel | Split or part-shaded roofs; per-panel monitoring shows a faulty panel (Which?) | Costs more than a string inverter (Which?) |
| Power optimisers | A small unit on each panel, feeding one central inverter | Roofs shaded at times by a chimney, a gable or a tree | Adds nothing on a roof with no shade (Energy Saving Trust) |
| Hybrid inverter | One unit that runs the panels and a battery on the same DC side | Homes fitting a battery now or within a few years | Dearer than a plain string inverter; saves a second inverter for the battery |
A battery that shares a hybrid inverter connects on the panel side, before the generation meter, and needs no inverter of its own (Which?). If a battery is likely within a few years, a hybrid in the first install saves swapping the inverter later. Your written design should name the type and say why it suits your roof. Replacement intervals for inverters, panels and batteries sit in our guide to how long solar panels and batteries last.
Match An Inverter Type To Your Roof
Three questions at most, following the table above. Your written design should name the type and say why it suits your roof.
Will a battery go in now or within a few years?
Which way do the panels face?
Does a chimney, a gable or a tree shade the panels at times?
If a battery is going in now or within a few years
Hybrid Inverter
One unit runs the panels and the battery on the same DC side. The battery connects before the generation meter and needs no inverter of its own (Which?). A hybrid costs more than a plain string inverter, and fitting one in the first install saves swapping the inverter when the battery arrives. If your roof is shaded at times or split across slopes, your written design should say how it handles that as well.
Our battery storage installation page covers sizing a battery to your tariff.
If no battery is planned yet and the panels face different ways
Microinverters
A small inverter sits behind each panel, which suits a split or part-shaded roof. Per-panel monitoring shows up a faulty panel, and microinverters cost more than a string inverter (Which?). If a battery becomes likely within a few years, a hybrid in the first install saves swapping the inverter later.
If no battery is planned yet, the panels face one way and nothing shades them
String Inverter
One unit, often in the loft or garage, takes the current from one or more runs of panels. It suits an unshaded roof with the panels facing one way. One shaded or failing panel drags down its whole run (Which?), so our engineer looks at what shades the roof through the day at the survey. If a battery becomes likely within a few years, a hybrid in the first install saves swapping the inverter later.
If no battery is planned yet and shade falls on the panels at times
Power Optimisers Or Microinverters
Both handle each panel on its own. Optimisers sit on each panel and feed one central inverter, cutting the losses from a chimney, a gable or a tree, and they add nothing on a roof with no shade (Energy Saving Trust). Microinverters put a small inverter behind each panel and cost more than a string inverter (Which?).
Your written design should say which of the two suits your roof, and why. If a battery becomes likely within a few years, a hybrid in the first install saves swapping the inverter later.
Where The Electricity Goes, And How It Shows On Your Bill

Your system sends solar power to three places, in this order.
The house, as you use it
Each kWh your appliances take from the roof is a unit you don’t buy, so your meter records fewer imported units and your bill falls by that amount.
The battery, if you have one
It stores the surplus for the evening.
The grid
Units you export earn money through an export tariff.
The Smart Export Guarantee (SEG) sets the rules for that last step. Since 1 January 2020, licensed suppliers called SEG Licensees have had to pay eligible small generators for exported electricity. Each one sets its own rate, contract length and terms, and Ofgem requires SEG rates to stay above zero. To qualify you need:
- an installation and an installer certified through MCS or an equivalent scheme such as Flexi-Orb;
- a meter that gives half-hourly export readings, such as a smart meter;
- a contract with a SEG supplier, which doesn’t have to be the company that sells you electricity (GOV.UK).
GOV.UK adds that a battery can be used to benefit from the SEG too, though storing more of your own solar means you export less. The consumer group Which? warns that a battery may rule you out of some SEG tariffs, so read the terms before you sign one. Export rates change often, so compare them on the day you sign.
How Does Solar Battery Storage Work?

A home battery stores electricity in lithium-ion cells and gives it back when the house asks for more than the roof can supply. A control unit compares what the panels make with what the house draws and runs the battery in whichever direction the numbers point.
Charging from the roof
While the panels make more than the house uses, the surplus fills the battery before any reaches the grid.
Discharging
While the house draws more than the roof makes, in the evening or under heavy cloud, the battery covers the gap.
Charging from the grid
On a tariff with cheap hours, the battery can fill from the grid overnight.
Batteries join a system in one of two ways. A DC-coupled battery sits on the panel side and shares a hybrid inverter. An AC-coupled battery connects after the generation meter and has its own converter, which costs more and leaves the existing solar side as it is (Which?). Our guide to adding a battery covers fitting one to panels you already have.
Compare batteries on usable capacity. Which? notes that usable capacity sits below the figure on the box, and that a battery loses some energy each time it charges and discharges. New home batteries run from about 5 kWh to 15 kWh, says Which?, and our guide to how many solar panels and what size battery you need works out the right size from your evening use.
Off-peak charging depends on your tariff. Ofgem says the newer “smart” time-of-use tariffs need a smart meter and your consent to share half-hourly data, while the older Economy 7 and Economy 10 tariffs give 7 or 10 cheaper hours. With either, a battery buys electricity in the cheap window and spends it in the dear one, which keeps it earning in December, when the roof makes little.
Do Solar Panels Work In A Power Cut? Only With Backup Designed In
A standard grid-connected system switches off when the grid goes down, even in full sun: the network rules require loss-of-mains protection that disconnects it, so it can’t feed power onto the street’s cables during the cut (the Distribution Code of Great Britain, which applies ENA’s G98 and G99). GOV.UK’s Be Ready guidance says some solar and battery installations with backup capability can keep supplying power in a cut, if they are designed and configured to run apart from the grid. If backup matters to you, ask for it at the design stage.
Backup changes the design in more than one place, so settle these four points with your designer before the quote is fixed:
- The switch: the system has to cut itself off from the street’s cables before the battery can run the house, the same loss-of-mains rule that shuts a standard system down. Ask how the backup system does that and how long the changeover takes.
- The circuits: ask whether backup feeds a single socket or a set of circuits, and which ones: the fridge, the lights and the router are the usual list.
- The reserve: a battery that empties every evening has little left for a cut at 2am. Ask whether you can hold back part of the charge for emergencies, and what that costs you in everyday savings.
- The daytime top-up: ask whether the panels keep charging the battery during a daytime cut, or whether the battery runs down until the grid returns.
Tell us at the survey if backup matters to you, and the written design states whether your system includes it and what it keeps running.
A Day In The Life Of A Solar House, With Illustrative Numbers

The two days below follow one made-up house so you can watch the power move. Neither table describes a measured home, and neither is a forecast for yours.
- Panels: 4 kWp facing south at 35° in New Mills. Output by time of day follows PVGIS averages for June and December.
- House: 6.8 kWh a day, the daily share of Ofgem’s 2,500 kWh a year for a medium user. The illustration keeps winter use at the same level so the two days compare.
- Battery: 5 kWh usable. Charging losses are left out to keep the sums readable.
An average June weekday (summer time)
| Time | Panels make (kWh) | House uses (kWh) | What happens | Battery afterwards (kWh) |
|---|---|---|---|---|
| Midnight to 6am | 0.1 | 0.6 | Battery runs the fridge and the router; first light adds a trickle before 6 | 3.6 |
| 6am to 10am | 2.8 | 1.4 | Panels cover breakfast and put 1.4 into the battery, which is full by 10 | 5.0 |
| 10am to 4pm | 8.9 | 1.6 | Battery already full; 7.3 goes to the grid | 5.0 |
| 4pm to 8pm | 2.6 | 2.2 | Panels still cover the cooking; 0.4 goes to the grid | 5.0 |
| 8pm to midnight | 0.1 | 1.0 | Battery covers the evening | 4.1 |
| Whole day | 14.5 | 6.8 | Nothing bought; 7.7 exported |
On this June day the house buys no electricity and exports more than it uses. The battery moves 1.4 kWh in and out and never drops below 3.6 kWh, so for this house in summer a 5 kWh battery has room to spare.
An average December weekday
| Time | Panels make (kWh) | House uses (kWh) | What happens | Battery afterwards (kWh) |
|---|---|---|---|---|
| Midnight to 6am | 0.0 | 0.6 | Cheap hours: the grid runs the house and refills the battery with 3.2 | 5.0 |
| 6am to 10am | 0.5 | 1.4 | Panels wake after 8; the battery covers the rest of breakfast | 4.1 |
| 10am to 4pm | 2.5 | 1.6 | Panels cover the house and put 0.9 into the battery | 5.0 |
| 4pm to 8pm | 0.0 | 2.2 | Battery covers the evening peak | 2.8 |
| 8pm to midnight | 0.0 | 1.0 | Battery covers the rest of the evening | 1.8 |
| Whole day | 3.0 | 6.8 | 3.8 bought, all in the cheap hours; nothing exported |
In December the roof makes less than half of what the house uses, and the battery earns its place through the tariff: it fills in the cheap hours and carries the house through the dear evening. The cheap window’s hours and price depend on your supplier. PVGIS reports its hours on Greenwich time, so we moved the June rows an hour later to match British Summer Time.
Telling The Network: G98, G99 And Your DNO

Your distribution network operator (DNO) runs the cables and substations in your street, and it needs to know about anything that can push power onto them. The Energy Networks Association sets two routes in its Engineering Recommendations G98 and G99.
- G98, connect and notify. A single system within the G98 limit goes in first, and the installer notifies the DNO within 28 days of commissioning.
- G99, apply first. A larger system, or a second generating unit in the same home, needs an application before fitting starts. The installer waits for the DNO’s answer, then sends the commissioning papers.
The inverter’s rating, and the number of generating units in the house, decide the route. Electricity North West, the DNO for Greater Manchester, takes the inverter’s continuous rating as the rating of the installation and covers storage on the same forms as generation. SSEN, the network operator for central southern England and the north of Scotland, says you must apply before you connect when a property has more than one generator. A battery added later beside existing panels can therefore move a home from one route to the other, so the installer checks the route again each time the system grows.
G98 Or G99: Find Your System’s Route
Two questions at most, both ones you can answer before any survey. Your installer confirms the route from the inverter’s rating and the number of units.
Does anything already generate or store power in the house?
Will a battery go in at the same time as the panels?
If this is the first system and it is panels only
The Inverter’s Rating Decides
One system within the G98 limit goes in first, and the installer notifies your DNO within 28 days of commissioning. A larger one needs a G99 application before fitting starts, and the installer waits for the DNO’s answer.
Electricity North West, the DNO for Greater Manchester, takes the inverter’s continuous rating as the rating of the installation. Ask the installer for that rating, the route it gives and who submits the form, and keep a copy with your MCS certificate.
If this is the first system and a battery goes in with the panels
The Battery Counts Too
A battery counts towards the inverter’s rating and towards the number of generating units, and Electricity North West covers storage on the same forms as generation. If the total goes over the G98 limit, or the battery counts as a second generating unit, the system needs a G99 application before fitting starts.
Ask the installer which route the panels and the battery take together, who submits the form, and for a copy for your records.
If panels or a battery are already fitted
Check The Route Again
Adding a battery or more panels to an existing system can change its route, because a battery counts towards the inverter’s rating and the number of generating units. Before anything new goes in, ask the installer to check the route again, who submits the form, and for a copy to keep with your MCS certificate.
We handle the DNO paperwork, with our specialist install partner where they are on the job. Whoever fits your system, ask three things: which route it takes, who submits the form, and for a copy for your records.
MCS: The Certificate Behind The Export Tariff

MCS describes itself as the UK’s quality mark for renewable energy systems. It certifies installers and the products they fit, and it lists the Smart Export Guarantee and the Boiler Upgrade Scheme among the incentives that need MCS certification.
For solar, the certificate is the document a SEG supplier asks for before it pays you for exports. A system fitted without it can still power your house, but it can’t earn under the SEG unless an equivalent scheme covers it.
- Ask any installer, us included, for the MCS certificate that will cover your installation before you sign.
- Check that the certificate names both the installer and the products.
- Keep it with the DNO paperwork, because a SEG supplier and any future buyer of your house will want to see both.
Where A Heat Pump Fits

“Heat pumps only work with solar and batteries.” Homeowners have put that worry to us in those words. A heat pump runs on the grid like any other appliance and stands on its own, with or without panels on the roof.
Put a heat pump on the route traced above and the consumer unit carries a far bigger load: hot water through the day, and heating into the evening and across the cold months. From spring to autumn the roof can take a share of the daytime part. In December the panels make little, so the saving comes from the tariff instead, with a battery filled in the cheap hours and spent while the heat pump runs. A battery earns most in a home that pairs it with a heat pump tariff.
Mention a planned heat pump at the solar survey, and the design sizes the inverter, the battery and the cabling for its load from the start. The heat pump installation page explains how we size the heating room by room, and the full renewables package quotes the heat pump, the panels and the battery together on one written design.
Solar Light From Glossop To Bakewell

Around the High Peak, the light on a roof changes more than a map suggests. PVGIS builds the hills around each place into its figures, and the table runs from Glossop at the foot of the moors to Bakewell in the Wye valley. We survey across all of it, and over towards Sheffield.
| Place | South roof at 35°: kWh per kWp a year | December: kWh per kWp |
|---|---|---|
| Glossop | 813 | 18.6 |
| Stockport | 850 | 25.3 |
| New Mills | 853 | 23.0 |
| Manchester city centre | 861 | 27.6 |
| Buxton | 873 | 22.3 |
| Hope | 900 | 24.3 |
| Bakewell | 904 | 25.9 |
| London, for comparison | 987 | 35.5 |
A south roof in Bakewell makes about 11% more over a year than the same roof in Glossop, and about 39% more in December. Central Manchester beats New Mills in December, for all the city’s name for rain. Your own roof adds the gable next door and the tree at the end of the garden, which a satellite record can’t see, so the survey checks the horizon from where the panels would sit.
Each area has its own page: solar panels and battery storage in the High Peak, in Glossop, in Buxton, in Stockport, in Manchester and in Bakewell.
How First Point Designs A Solar And Battery System

The design follows the route this guide has traced, from your roof to your meter, and puts each choice on paper for your house.
If waiting would suit your house better, the survey is where you hear it, before a scaffold goes up. The solar PV installation and battery storage installation pages set out the full process.
Solar Panel And Battery Questions

Do solar panels work at night?
No. Panels need daylight, so output stops at dusk and starts again in the morning (Which?). Overnight your home runs on a battery if you have one and on the grid after that. A battery filled in a cheap overnight window can cover the expensive early-evening hours instead.
How does solar battery storage work with an off-peak tariff?
The battery fills from the grid during your tariff’s cheap hours and hands that electricity back during the dear ones, on top of storing surplus from the roof. Ofgem says the newer smart time-of-use tariffs need a smart meter and consent to share half-hourly data. Our battery storage installation page covers sizing a battery to your tariff.
What is a solar inverter, and where does it go?
The inverter converts the panels’ direct current into the alternating current your home and the grid use. Which? notes that inverters often go in the loft, where heat can affect them, and that a garage can suit better. A hybrid inverter also runs a battery.
How do solar panels work with your electricity bill?
Each unit your home uses from the roof is a unit you don’t buy, so your import falls. Units you export earn money through a Smart Export Guarantee tariff, which needs MCS or equivalent certification and a meter that reads exports half-hourly. Our guide to solar panel costs covers the price side.
Do solar panels work in a power cut?
A standard system switches off in a power cut, even on a sunny day. GOV.UK’s Be Ready guidance says some solar and battery installations with backup capability can keep supplying power in a cut if they are designed and configured to run apart from the grid, which may help keep essential appliances running. Ask for backup at the design stage if you need it.
Do I need to tell my network operator about solar panels?
Yes, and your installer does it. For a small system the installer sends a G98 notice within 28 days of commissioning; a larger one needs the DNO’s approval under G99 before fitting starts. The inverter’s rating and the number of units decide the route, and a battery counts towards both.
Do you design solar and batteries for homes in Manchester, Glossop and Bakewell?
Yes. Our engineer surveys homes across Manchester and Stockport, the High Peak, the Hope Valley and Bakewell, and over towards Sheffield. Each design starts from your own bills and your own roof.
Sources

- US Department of Energy, How Does Solar Work?
- European Commission JRC, PVGIS 5.3 (SARAH3 2005 to 2023, horizon on, 14% loss, 35° south, building-integrated): PVcalc and DRcalc APIs, https://re.jrc.ec.europa.eu/pvg_tools/en/
- SolarWatt UK, Solar panels
- Which?, Buying advice for solar panels (12 Aug 2026)
- Which?, Solar panel battery storage (15 May 2026)
- Which?, Solar panel problems and how to solve them
- Energy Saving Trust, Solar inverters
- GOV.UK, Smart Export Guarantee
- Ofgem, Smart Export Guarantee
- Ofgem, Energy price cap: technical approach to MHHS, call for input (25 March 2026), para 2.55
- Ofgem, Summary of changes to the energy price cap, 1 October to 31 December 2026
- Energy Networks Association, Distributed Generation Connection Guides, G98 for Single Premises
- SSEN (Scottish and Southern Electricity Networks), Installation of up to 3.68kW per phase at one property
- Electricity North West, G98 Form B (ENA EREC G98 Issue 1 Amendment 4, 2019)
- The Distribution Code of Licensed Distribution Network Operators of Great Britain, Issue 62 (27 August 2026), DPC7.4.3.2 and DPC7.4.3.3, and Annex 1 (current qualifying standards: EREC G98 Issue 2 Amendment 1; EREC G99 Issue 2)
- Electricity North West, Micro-generation and storage connections
- MCS, Consumers
- GOV.UK Be Ready, Power cuts
Google Reviews From Our Customers

More Guides
All GuidesSee What Your Own Roof Would Do

Book the free survey and our engineer reads a year of your bills and checks your roof. The written design shows what the panels would make, how the battery would run on your tariff, and a fixed price, with a heat pump allowed for if one is on your list.