Skip to content
Solar And Batteries

How Do Solar Panels Work On A House In Manchester, Sheffield Or Leeds, And Where Does A Battery Fit?

A 4 kWp array in New Mills makes about 14.5 kWh on a June day but only 3 kWh in December, so a battery’s job shifts.

A large gritstone house with a long solar array on its slate roof, and a gritstone house with an array above a green valley

Key Takeaways

Black solar panels close up on a grey slate roof, a solar inverter and isolators on the wall of a tidy garage and a white battery stack under a wall mounted inverter in a bright utility room
  • Silicon cells release electrons when light falls on them, and an electric field built into each cell pushes those electrons round a circuit as direct current (US Department of Energy).
  • The inverter converts direct current into the alternating current your home runs on. A string inverter serves a whole run of panels, microinverters or optimisers handle each panel, and a hybrid inverter runs a battery as well.
  • Your home uses solar power first. Surplus fills a battery, then goes to the grid, where a Smart Export Guarantee supplier pays for it once the installation and installer hold MCS or equivalent certification and a meter records exports half-hourly.
  • A battery fills from surplus solar and empties when the house needs more than the roof makes. On a tariff with cheap hours it can also fill from the grid overnight, which keeps it working through winter.
  • Your network operator has to know about the system. The inverter’s rating and the number of generating units in the house decide between a notice within 28 days of commissioning (G98) and an application before fitting (G99).
  • On a south roof in New Mills, a 4 kWp array makes about 14.5 kWh on an average June day and about 3 kWh on an average December day (PVGIS).
In This Guide

A solar panel turns daylight into electricity inside thin slices of silicon. The panels make direct current, an inverter converts it into the alternating current your sockets use, and that supply joins your home’s wiring at the consumer unit, beside the grid. Your house uses the solar power first, a battery takes the surplus if you have one, and anything left flows out to the grid through your meter.

After dark the flow runs the other way. The battery hands back what it stored during the day, and the grid covers the rest, as it did before the panels went up.

From Light To Current: The Photovoltaic Effect In Plain English

Black solar panels on a slate roof seen from the scaffold, the mounting rails visible at the edge, and solar panels on a stone house roof with green hills beyond

A solar cell is a thin wafer of silicon, a semiconductor. Manufacturers treat each face of the wafer so the two sides carry opposite electrical charges, and the boundary between them sets up an electric field inside the cell. Light falling on the silicon hands its energy to electrons, and the field drives those loose electrons one way: out through the fine metal lines printed on the cell’s face and round whatever circuit you connect. The US Department of Energy describes the treated wafer as a diode, which lets current pass in one direction.

That one-way current is direct current (DC), the kind a torch battery gives. A single cell makes very little, so a panel wires dozens of them together. Take one current example from the maker’s range, SolarWatt’s Panel vision M 5.5: SolarWatt lists it from 465 Wp with 96 half-cut cells. Your written design names the exact panel.

Panel ratings come from a factory test with 1,000 W of light on each square metre. The M 5.5 measures 1,762 mm by 1,134 mm, about 2 m², so in that test it turns about 23% of the light reaching it into electricity, by our arithmetic. The US Department of Energy puts the theoretical ceiling for a silicon cell at about 32%.

Your roof sees test-strength light on few days of the year. The European Commission’s PVGIS tool gives an average of about 540 W per square metre at midday in June on a south-facing roof pitched at 35° in New Mills, and about 190 W at midday in December. Allow PVGIS’s standard 14% for system losses and a 4 kWp array on that roof averages a little under 2 kW at a June midday and about 0.65 kW at a December one.

More light, more current

Output rises and falls with the light on the panel through the day.

Angle and direction

PVGIS gives an east or west slope at 35° in New Mills about 695 kWh per kWp a year, a fifth less than the 853 a south slope makes (our guide to solar panels on slate and north-facing roofs works through direction).

Cloud

Cloud lowers output without stopping it; our guide on whether solar and battery storage is worth it covers cloudy days in the Peak District.

How Do Solar Panels Work On A House? The Route From Roof To Socket

A gritstone house with eight black solar panels on its slate roof, and a consumer unit with a generation meter and an isolator in a cupboard

Follow the power from the slates to the kettle and it passes through eight pieces of kit, numbered as in the diagram above.

  1. Panels

    Rails and roof hooks hold the panels to the rafters. The panels in each run connect in series, so their voltages add up.

  2. DC cable and isolator

    Cables bring the direct current down through the roof to a switch that lets an engineer cut the panels off before working on anything downstream.

  3. Inverter

    The inverter converts DC into AC that matches the grid. Which? notes that inverters often sit in the loft, where heat can affect them, and that a garage can suit better.

  4. Generation meter

    A meter on the inverter’s output counts each kWh the panels make, wherever that unit goes next. Its reading lets you check the system against the yearly figure in your design.

  5. Consumer unit

    The solar supply joins your circuits through its own breaker in the fuse box. Which? advises checking that breaker first if the system stays off after a power cut.

  6. Your lights and sockets

    Appliances running at that moment take the solar power first, and the grid tops up anything the roof can’t cover.

  7. Smart meter

    Your meter records what you buy from the grid. A smart meter also records what you send out in half-hour slots, which an export tariff needs (GOV.UK).

  8. The grid

    Surplus that the house and any battery can’t take flows out onto the local network.

Panels make nothing after dark (Which?), so at night your home runs on the battery and then the grid. You don’t switch anything over at dusk or dawn: the inverter starts and stops with the light.

The Route At Midday, After Dark And In A Power Cut

Pick a moment to see how power moves through the eight numbered parts above.

Midday

The panels (1) make direct current, and it runs through the DC cable and isolator (2) to the inverter (3), which converts it to AC. The generation meter (4) counts each kWh on its way to the consumer unit (5).

Your lights and sockets (6) take what they need first. A battery, if you have one, fills from the surplus, and anything left leaves through the smart meter (7) to the grid (8). The smart meter records that export in half-hour slots, which an export tariff needs.

Evening

As the light fades, the house starts drawing more than the roof makes. A battery covers the gap. Once the battery runs low, or if you have none, the grid tops up the rest and your smart meter (7) records the units you buy.

Night

The panels make nothing after dark. The house runs on the battery if you have one, then on the grid, as it did before the panels went up. On a tariff with cheap overnight hours, the battery can also fill from the grid during them.

Power Cut

A standard grid-connected system switches off when the grid goes down, even in full sun. The network rules require loss-of-mains protection that disconnects it, so it can’t feed power onto the street’s cables during the cut.

GOV.UK’s Be Ready guidance says some solar and battery installations with backup capability can keep supplying power in a cut, if they are designed and configured to run apart from the grid. If backup matters to you, ask for it at the design stage.

If your system stays off after a power cut, Which? advises checking its own breaker in the consumer unit (5) first.

String Inverters, Microinverters, Optimisers And Hybrid Inverters

A hybrid inverter and isolators on a board in a stone loft, a white home battery under its inverter in a garage and a block of black solar panels on a slate roof above a gutter, with the valley behind

A solar inverter is the box that turns the panels’ direct current into the alternating current your home and the grid use. Four designs do that job, and the shade on your roof and any plan for a battery decide between them.

DesignWhere it sitsSuitsWatch for
String inverterOne unit, often in the loft or garage, fed by one or more runs of panelsUnshaded roofs with the panels facing one wayOne shaded or failing panel drags down its whole run (Which?)
MicroinvertersA small inverter behind each panelSplit or part-shaded roofs; per-panel monitoring shows a faulty panel (Which?)Costs more than a string inverter (Which?)
Power optimisersA small unit on each panel, feeding one central inverterRoofs shaded at times by a chimney, a gable or a treeAdds nothing on a roof with no shade (Energy Saving Trust)
Hybrid inverterOne unit that runs the panels and a battery on the same DC sideHomes fitting a battery now or within a few yearsDearer than a plain string inverter; saves a second inverter for the battery

A battery that shares a hybrid inverter connects on the panel side, before the generation meter, and needs no inverter of its own (Which?). If a battery is likely within a few years, a hybrid in the first install saves swapping the inverter later. Your written design should name the type and say why it suits your roof. Replacement intervals for inverters, panels and batteries sit in our guide to how long solar panels and batteries last.

Match An Inverter Type To Your Roof

Three questions at most, following the table above. Your written design should name the type and say why it suits your roof.

Will a battery go in now or within a few years?

Which way do the panels face?

Does a chimney, a gable or a tree shade the panels at times?

If a battery is going in now or within a few years

Hybrid Inverter

One unit runs the panels and the battery on the same DC side. The battery connects before the generation meter and needs no inverter of its own (Which?). A hybrid costs more than a plain string inverter, and fitting one in the first install saves swapping the inverter when the battery arrives. If your roof is shaded at times or split across slopes, your written design should say how it handles that as well.

Our battery storage installation page covers sizing a battery to your tariff.

If no battery is planned yet and the panels face different ways

Microinverters

A small inverter sits behind each panel, which suits a split or part-shaded roof. Per-panel monitoring shows up a faulty panel, and microinverters cost more than a string inverter (Which?). If a battery becomes likely within a few years, a hybrid in the first install saves swapping the inverter later.

If no battery is planned yet, the panels face one way and nothing shades them

String Inverter

One unit, often in the loft or garage, takes the current from one or more runs of panels. It suits an unshaded roof with the panels facing one way. One shaded or failing panel drags down its whole run (Which?), so our engineer looks at what shades the roof through the day at the survey. If a battery becomes likely within a few years, a hybrid in the first install saves swapping the inverter later.

If no battery is planned yet and shade falls on the panels at times

Power Optimisers Or Microinverters

Both handle each panel on its own. Optimisers sit on each panel and feed one central inverter, cutting the losses from a chimney, a gable or a tree, and they add nothing on a roof with no shade (Energy Saving Trust). Microinverters put a small inverter behind each panel and cost more than a string inverter (Which?).

Your written design should say which of the two suits your roof, and why. If a battery becomes likely within a few years, a hybrid in the first install saves swapping the inverter later.

Where The Electricity Goes, And How It Shows On Your Bill

A large red brick house with black solar panels across its roof and a car on the drive, and a battery and inverter on the wall of a garage beside the isolator switches

Your system sends solar power to three places, in this order.

  1. The house, as you use it

    Each kWh your appliances take from the roof is a unit you don’t buy, so your meter records fewer imported units and your bill falls by that amount.

  2. The battery, if you have one

    It stores the surplus for the evening.

  3. The grid

    Units you export earn money through an export tariff.

The Smart Export Guarantee (SEG) sets the rules for that last step. Since 1 January 2020, licensed suppliers called SEG Licensees have had to pay eligible small generators for exported electricity. Each one sets its own rate, contract length and terms, and Ofgem requires SEG rates to stay above zero. To qualify you need:

  • an installation and an installer certified through MCS or an equivalent scheme such as Flexi-Orb;
  • a meter that gives half-hourly export readings, such as a smart meter;
  • a contract with a SEG supplier, which doesn’t have to be the company that sells you electricity (GOV.UK).

GOV.UK adds that a battery can be used to benefit from the SEG too, though storing more of your own solar means you export less. The consumer group Which? warns that a battery may rule you out of some SEG tariffs, so read the terms before you sign one. Export rates change often, so compare them on the day you sign.

How Does Solar Battery Storage Work?

A white home battery and inverter on the wall of a garage, and a stone detached house with a black solar array and a car on the drive

A home battery stores electricity in lithium-ion cells and gives it back when the house asks for more than the roof can supply. A control unit compares what the panels make with what the house draws and runs the battery in whichever direction the numbers point.

Charging from the roof

While the panels make more than the house uses, the surplus fills the battery before any reaches the grid.

Discharging

While the house draws more than the roof makes, in the evening or under heavy cloud, the battery covers the gap.

Charging from the grid

On a tariff with cheap hours, the battery can fill from the grid overnight.

Batteries join a system in one of two ways. A DC-coupled battery sits on the panel side and shares a hybrid inverter. An AC-coupled battery connects after the generation meter and has its own converter, which costs more and leaves the existing solar side as it is (Which?). Our guide to adding a battery covers fitting one to panels you already have.

Compare batteries on usable capacity. Which? notes that usable capacity sits below the figure on the box, and that a battery loses some energy each time it charges and discharges. New home batteries run from about 5 kWh to 15 kWh, says Which?, and our guide to how many solar panels and what size battery you need works out the right size from your evening use.

Off-peak charging depends on your tariff. Ofgem says the newer “smart” time-of-use tariffs need a smart meter and your consent to share half-hourly data, while the older Economy 7 and Economy 10 tariffs give 7 or 10 cheaper hours. With either, a battery buys electricity in the cheap window and spends it in the dear one, which keeps it earning in December, when the roof makes little.

Do Solar Panels Work In A Power Cut? Only With Backup Designed In

A standard grid-connected system switches off when the grid goes down, even in full sun: the network rules require loss-of-mains protection that disconnects it, so it can’t feed power onto the street’s cables during the cut (the Distribution Code of Great Britain, which applies ENA’s G98 and G99). GOV.UK’s Be Ready guidance says some solar and battery installations with backup capability can keep supplying power in a cut, if they are designed and configured to run apart from the grid. If backup matters to you, ask for it at the design stage.

Backup changes the design in more than one place, so settle these four points with your designer before the quote is fixed:

  • The switch: the system has to cut itself off from the street’s cables before the battery can run the house, the same loss-of-mains rule that shuts a standard system down. Ask how the backup system does that and how long the changeover takes.
  • The circuits: ask whether backup feeds a single socket or a set of circuits, and which ones: the fridge, the lights and the router are the usual list.
  • The reserve: a battery that empties every evening has little left for a cut at 2am. Ask whether you can hold back part of the charge for emergencies, and what that costs you in everyday savings.
  • The daytime top-up: ask whether the panels keep charging the battery during a daytime cut, or whether the battery runs down until the grid returns.

Tell us at the survey if backup matters to you, and the written design states whether your system includes it and what it keeps running.

A Day In The Life Of A Solar House, With Illustrative Numbers

A stone house above a sloping garden with solar panels on its roof, and a Tudor style house with a wide black solar array above its garden

The two days below follow one made-up house so you can watch the power move. Neither table describes a measured home, and neither is a forecast for yours.

  • Panels: 4 kWp facing south at 35° in New Mills. Output by time of day follows PVGIS averages for June and December.
  • House: 6.8 kWh a day, the daily share of Ofgem’s 2,500 kWh a year for a medium user. The illustration keeps winter use at the same level so the two days compare.
  • Battery: 5 kWh usable. Charging losses are left out to keep the sums readable.

An average June weekday (summer time)

TimePanels make (kWh)House uses (kWh)What happensBattery afterwards (kWh)
Midnight to 6am0.10.6Battery runs the fridge and the router; first light adds a trickle before 63.6
6am to 10am2.81.4Panels cover breakfast and put 1.4 into the battery, which is full by 105.0
10am to 4pm8.91.6Battery already full; 7.3 goes to the grid5.0
4pm to 8pm2.62.2Panels still cover the cooking; 0.4 goes to the grid5.0
8pm to midnight0.11.0Battery covers the evening4.1
Whole day14.56.8Nothing bought; 7.7 exported

On this June day the house buys no electricity and exports more than it uses. The battery moves 1.4 kWh in and out and never drops below 3.6 kWh, so for this house in summer a 5 kWh battery has room to spare.

An average December weekday

TimePanels make (kWh)House uses (kWh)What happensBattery afterwards (kWh)
Midnight to 6am0.00.6Cheap hours: the grid runs the house and refills the battery with 3.25.0
6am to 10am0.51.4Panels wake after 8; the battery covers the rest of breakfast4.1
10am to 4pm2.51.6Panels cover the house and put 0.9 into the battery5.0
4pm to 8pm0.02.2Battery covers the evening peak2.8
8pm to midnight0.01.0Battery covers the rest of the evening1.8
Whole day3.06.83.8 bought, all in the cheap hours; nothing exported

In December the roof makes less than half of what the house uses, and the battery earns its place through the tariff: it fills in the cheap hours and carries the house through the dear evening. The cheap window’s hours and price depend on your supplier. PVGIS reports its hours on Greenwich time, so we moved the June rows an hour later to match British Summer Time.

June And December On One Scale

The whole-day rows of the two illustrative tables above, for the same made-up house: what the panels made, what the house used, and what went to or came from the grid.

June, panels made

14.5 kWh

December, panels made

3.0 kWh

June, house used

6.8 kWh

December, house used

6.8 kWh

June, exported

7.7 kWh

December, exported

None

June, bought

None

December, bought

3.8 kWh, all in the cheap hours

Illustrative, not a measured home: 4 kWp facing south at 35° in New Mills, output from PVGIS June and December averages, 6.8 kWh a day of use from Ofgem’s 2,500 kWh a year for a medium user, a 5 kWh usable battery, charging losses left out. Figures checked 26 October 2026.

Telling The Network: G98, G99 And Your DNO

A red brick semi with a small solar array on its tiled roof, and a generation meter and two isolator switches on a white wall

Your distribution network operator (DNO) runs the cables and substations in your street, and it needs to know about anything that can push power onto them. The Energy Networks Association sets two routes in its Engineering Recommendations G98 and G99.

  • G98, connect and notify. A single system within the G98 limit goes in first, and the installer notifies the DNO within 28 days of commissioning.
  • G99, apply first. A larger system, or a second generating unit in the same home, needs an application before fitting starts. The installer waits for the DNO’s answer, then sends the commissioning papers.

The inverter’s rating, and the number of generating units in the house, decide the route. Electricity North West, the DNO for Greater Manchester, takes the inverter’s continuous rating as the rating of the installation and covers storage on the same forms as generation. SSEN, the network operator for central southern England and the north of Scotland, says you must apply before you connect when a property has more than one generator. A battery added later beside existing panels can therefore move a home from one route to the other, so the installer checks the route again each time the system grows.

G98 Or G99: Find Your System’s Route

Two questions at most, both ones you can answer before any survey. Your installer confirms the route from the inverter’s rating and the number of units.

Does anything already generate or store power in the house?

Will a battery go in at the same time as the panels?

If this is the first system and it is panels only

The Inverter’s Rating Decides

One system within the G98 limit goes in first, and the installer notifies your DNO within 28 days of commissioning. A larger one needs a G99 application before fitting starts, and the installer waits for the DNO’s answer.

Electricity North West, the DNO for Greater Manchester, takes the inverter’s continuous rating as the rating of the installation. Ask the installer for that rating, the route it gives and who submits the form, and keep a copy with your MCS certificate.

If this is the first system and a battery goes in with the panels

The Battery Counts Too

A battery counts towards the inverter’s rating and towards the number of generating units, and Electricity North West covers storage on the same forms as generation. If the total goes over the G98 limit, or the battery counts as a second generating unit, the system needs a G99 application before fitting starts.

Ask the installer which route the panels and the battery take together, who submits the form, and for a copy for your records.

If panels or a battery are already fitted

Check The Route Again

Adding a battery or more panels to an existing system can change its route, because a battery counts towards the inverter’s rating and the number of generating units. Before anything new goes in, ask the installer to check the route again, who submits the form, and for a copy to keep with your MCS certificate.

We handle the DNO paperwork, with our specialist install partner where they are on the job. Whoever fits your system, ask three things: which route it takes, who submits the form, and for a copy for your records.

MCS: The Certificate Behind The Export Tariff

A stone cottage with solar panels in two rows beside its chimney, and a block of black solar panels seen along the scaffold walkway at the eaves

MCS describes itself as the UK’s quality mark for renewable energy systems. It certifies installers and the products they fit, and it lists the Smart Export Guarantee and the Boiler Upgrade Scheme among the incentives that need MCS certification.

For solar, the certificate is the document a SEG supplier asks for before it pays you for exports. A system fitted without it can still power your house, but it can’t earn under the SEG unless an equivalent scheme covers it.

  • Ask any installer, us included, for the MCS certificate that will cover your installation before you sign.
  • Check that the certificate names both the installer and the products.
  • Keep it with the DNO paperwork, because a SEG supplier and any future buyer of your house will want to see both.

Where A Heat Pump Fits

A stone barn conversion with solar panels on its roof and a heat pump by the door, and a black heat pump on a wall bracket at the side of a stone house beside trees

“Heat pumps only work with solar and batteries.” Homeowners have put that worry to us in those words. A heat pump runs on the grid like any other appliance and stands on its own, with or without panels on the roof.

Put a heat pump on the route traced above and the consumer unit carries a far bigger load: hot water through the day, and heating into the evening and across the cold months. From spring to autumn the roof can take a share of the daytime part. In December the panels make little, so the saving comes from the tariff instead, with a battery filled in the cheap hours and spent while the heat pump runs. A battery earns most in a home that pairs it with a heat pump tariff.

Mention a planned heat pump at the solar survey, and the design sizes the inverter, the battery and the cabling for its load from the start. The heat pump installation page explains how we size the heating room by room, and the full renewables package quotes the heat pump, the panels and the battery together on one written design.

Solar Light From Glossop To Bakewell

A mock Tudor house with solar panels on its roof, and a stone semi with six solar panels above its drive

Around the High Peak, the light on a roof changes more than a map suggests. PVGIS builds the hills around each place into its figures, and the table runs from Glossop at the foot of the moors to Bakewell in the Wye valley. We survey across all of it, and over towards Sheffield.

PlaceSouth roof at 35°: kWh per kWp a yearDecember: kWh per kWp
Glossop81318.6
Stockport85025.3
New Mills85323.0
Manchester city centre86127.6
Buxton87322.3
Hope90024.3
Bakewell90425.9
London, for comparison98735.5

A south roof in Bakewell makes about 11% more over a year than the same roof in Glossop, and about 39% more in December. Central Manchester beats New Mills in December, for all the city’s name for rain. Your own roof adds the gable next door and the tree at the end of the garden, which a satellite record can’t see, so the survey checks the horizon from where the panels would sit.

Each area has its own page: solar panels and battery storage in the High Peak, in Glossop, in Buxton, in Stockport, in Manchester and in Bakewell.

How First Point Designs A Solar And Battery System

A First Point engineer on a building site in front of scaffolding, and a stone double garage with black solar panels on its roof

The design follows the route this guide has traced, from your roof to your meter, and puts each choice on paper for your house.

What You Get

  • One survey visit. Our own engineer goes through a year of your bills, then looks at the roof: its condition, which way each slope faces and what shades it through the day.
  • A written design. It sets out the system size, the battery and the tariff it runs on, the payback workings and a fixed price.
  • SolarWatt panels and batteries, fitted to that design by our specialist install partner. We handle the DNO notice or application, with the partner where they are on the job.
  • Two years of workmanship cover on the install, alongside each manufacturer’s own warranty.

If waiting would suit your house better, the survey is where you hear it, before a scaffold goes up. The solar PV installation and battery storage installation pages set out the full process.

Solar Panel And Battery Questions

A long stone house with a full width solar array above green hills, and a white home battery under a wall mounted inverter in a garage with whitewashed walls

Do solar panels work at night?

No. Panels need daylight, so output stops at dusk and starts again in the morning (Which?). Overnight your home runs on a battery if you have one and on the grid after that. A battery filled in a cheap overnight window can cover the expensive early-evening hours instead.

How does solar battery storage work with an off-peak tariff?

The battery fills from the grid during your tariff’s cheap hours and hands that electricity back during the dear ones, on top of storing surplus from the roof. Ofgem says the newer smart time-of-use tariffs need a smart meter and consent to share half-hourly data. Our battery storage installation page covers sizing a battery to your tariff.

What is a solar inverter, and where does it go?

The inverter converts the panels’ direct current into the alternating current your home and the grid use. Which? notes that inverters often go in the loft, where heat can affect them, and that a garage can suit better. A hybrid inverter also runs a battery.

How do solar panels work with your electricity bill?

Each unit your home uses from the roof is a unit you don’t buy, so your import falls. Units you export earn money through a Smart Export Guarantee tariff, which needs MCS or equivalent certification and a meter that reads exports half-hourly. Our guide to solar panel costs covers the price side.

Do solar panels work in a power cut?

A standard system switches off in a power cut, even on a sunny day. GOV.UK’s Be Ready guidance says some solar and battery installations with backup capability can keep supplying power in a cut if they are designed and configured to run apart from the grid, which may help keep essential appliances running. Ask for backup at the design stage if you need it.

Do I need to tell my network operator about solar panels?

Yes, and your installer does it. For a small system the installer sends a G98 notice within 28 days of commissioning; a larger one needs the DNO’s approval under G99 before fitting starts. The inverter’s rating and the number of units decide the route, and a battery counts towards both.

Do you design solar and batteries for homes in Manchester, Glossop and Bakewell?

Yes. Our engineer surveys homes across Manchester and Stockport, the High Peak, the Hope Valley and Bakewell, and over towards Sheffield. Each design starts from your own bills and your own roof.

Lewis Harding, head plumber and gas engineer at First Point Plumbing and Heating, smiling in a black company hoodie

Lewis Harding

Head Plumber and Gas Engineer

Lewis has ten years in the trade. He started on his own, fitting boilers and bathrooms, and has spent the past year on heat pump and system design.

  • Gas Safe 930763
  • F-Gas FGAS3028681
  • Which? Trusted Trader
About Lewis And The Team

Sources

A roof hook and mounting rail under the edge of a solar panel on a slate roof, and a square stone house with solar panels on its roof and hills behind
  1. US Department of Energy, How Does Solar Work?
  2. European Commission JRC, PVGIS 5.3 (SARAH3 2005 to 2023, horizon on, 14% loss, 35° south, building-integrated): PVcalc and DRcalc APIs, https://re.jrc.ec.europa.eu/pvg_tools/en/
  3. SolarWatt UK, Solar panels
  4. Which?, Buying advice for solar panels (12 Aug 2026)
  5. Which?, Solar panel battery storage (15 May 2026)
  6. Which?, Solar panel problems and how to solve them
  7. Energy Saving Trust, Solar inverters
  8. GOV.UK, Smart Export Guarantee
  9. Ofgem, Smart Export Guarantee
  10. Ofgem, Energy price cap: technical approach to MHHS, call for input (25 March 2026), para 2.55
  11. Ofgem, Summary of changes to the energy price cap, 1 October to 31 December 2026
  12. Energy Networks Association, Distributed Generation Connection Guides, G98 for Single Premises
  13. SSEN (Scottish and Southern Electricity Networks), Installation of up to 3.68kW per phase at one property
  14. Electricity North West, G98 Form B (ENA EREC G98 Issue 1 Amendment 4, 2019)
  15. The Distribution Code of Licensed Distribution Network Operators of Great Britain, Issue 62 (27 August 2026), DPC7.4.3.2 and DPC7.4.3.3, and Annex 1 (current qualifying standards: EREC G98 Issue 2 Amendment 1; EREC G99 Issue 2)
  16. Electricity North West, Micro-generation and storage connections
  17. MCS, Consumers
  18. GOV.UK Be Ready, Power cuts

Google Reviews From Our Customers

A First Point engineer with a shaved head in a company hoodie beside the van, and a red brick house with a double garage and a black solar array on its roof

More Guides

All Guides

See What Your Own Roof Would Do

Four First Point engineers in black branded polos standing in a row in front of a dark grey crew van

Book the free survey and our engineer reads a year of your bills and checks your roof. The written design shows what the panels would make, how the battery would run on your tariff, and a fixed price, with a heat pump allowed for if one is on your list.