Skip to content
MVHR installation for Hayfield homes: a white Mitsubishi Electric Lossnay MVHR unit on a raised platform in a sunny boarded loft, with insulated ducts to the gable wall and down to the rooms and its condensate drain running through a trap

MVHR Installation In Hayfield, Checked Against Stone Walls And Damp First

Insulate a stone house and the moisture it used to lose through the gaps stays inside. We measure your rooms, note where the damp shows, and design the ventilation with your heating before we fix a price.

  • Gas Safe Register mark, First Point gas engineer registration 930763
  • F-Gas Register mark, First Point registration FGAS3028681
  • Heat Geek trained
  • Stiebel Eltron certified installer
  • Which? Trusted Trader
Finance through Ideal4Finance

Spread The Cost Of Your Install

  • APR (fixed) 12.9%
  • Loans from £1 to £30,000
  • Finance over 12 to 120 months
  • Ask for finance with your quote
  • We agree any deposit with you before you apply

Representative example: £8,000 purchase, £2,000 deposit, £6,000 credit over 48 months at 12.9% APR (fixed). 48 monthly payments of £160.67. Total repayable £7,712.03. Total cost £9,712.03.

First Point Plumbing & Heating is an Introducer Appointed Representative of Ideal Sales Solutions Ltd, t/a Ideal4Finance. Ideal Sales Solutions Ltd is a credit broker and not a lender (FRN 703401). Finance available subject to status. There are risks involved in taking out a loan and you should ensure you can make all payments on time and in full; failure to do so can lead to financial difficulties and have a negative impact on your credit score.

MVHR installation for Hayfield homes: an open boiler casing with the heat exchanger exposed during a service

Insulating A Hayfield Stone House Can Trap The Damp Inside

New insulation and windows kept shut through winter leave the moisture from cooking, washing and drying clothes with fewer ways out.

Historic England’s 2024 advice on older buildings warns that better insulation can cause humidity problems, even with breathable materials and passive vents in place, and names MVHR as sometimes the best way to manage it. In a weaver’s house with deep stone reveals, the cold stone round the mullioned windows is where the damp settles first.

A worry worth settling before anyone talks about ducts:

  • “I’m just worried we won’t be warm enough with stone walls.”

Heat recovery passes most of the warmth in the outgoing air to the fresh air coming in, so ventilating the house doesn’t mean heating the valley. The survey measures what your walls lose before we size the heating or the ventilation.

MVHR In Hayfield, Designed Around The House You Have

We start with the walls and the rooms where the damp shows, then size the airflow and the heating from one survey.

  • The damp rooms noted at the survey, so the design starts where the moisture gathers

  • Room-by-room airflow from the heat loss and room volumes we measure for your heating

  • Duct and terminal positions settled at the design stage, with the conservation rules checked

  • A Mitsubishi MVHR unit on a fixed quote, with 2 years of cover on our work beside the manufacturer’s warranty

MVHR installation for Hayfield homes: a white Mitsubishi Electric Lossnay MVHR unit on a raised timber platform in a boarded loft, seen from the loft hatch, with four insulated ducts taped onto its top spigots, two foil ducts running to round terminals on the stone gable and two grey ducts feeding plenums whose radial ducts drop under the loft insulation, powered from a switched fused spur on the post

Follow The Air Through A Hayfield House

Scroll the four stages: steam and stale air leave the kitchen and bathroom, filtered air reaches the bedrooms, the core passes the warmth across, and the heating survey sets the size.

  1. Stale Air Leaves The Wet Rooms

    Damp air is pulled out of bathrooms and kitchens and carried outside.

    • Extract Valve
    • Extract Duct
    • Exhaust Duct
    • Exhaust Terminal
    • Stale Air
  2. Fresh Air Comes Back Filtered

    Outside air comes in through the filters and is supplied to the rooms you live in.

    • Intake Terminal
    • Intake Duct
    • Supply Duct
    • Supply Valve
    • Fresh Air
  3. The Core Keeps The Warmth

    Both streams pass through the heat exchanger, so most of the warmth stays inside.

    • Heat Exchanger Core
    • Fresh Air Filter
    • Extract Filter
    • Supply Fan
    • Extract Fan
  4. Sized From The Heating Survey

    Ductwork and airflow are sized from the numbers used for your heating, so nothing is measured twice.

    • Unit
    • End Panel
    • Lid
    • Controller

What’s In An MVHR Installation For A Hayfield Home

Six stages, priced together in writing, from the first measurement to the controls.

The quote names each of them before we order a thing.

  1. Tell Us About The Damp

    List the rooms that run wet or stuffy and roughly how old the house is, and our office answers inside one working day.

    MVHR installation for Hayfield homes: step 1, the form and a short visit
  2. A Survey That Starts With The Walls

    Our lead engineer comes out in person to measure heat loss and room sizes, checks the roof space, and notes the rooms where the moisture gathers.

    MVHR installation for Hayfield homes: step 2, a system filter as standard
  3. Air And Heat On One Drawing

    Duct routes, unit size and the airflow for each room, designed with your heating.

    MVHR installation for Hayfield homes: step 4, balanced radiators
  4. Price Before Order

    The unit, the terminal positions, any permission the design needs and the price, in writing together, plus how long we’ll be there and how much upheaval to expect.

    MVHR installation for Hayfield homes: step 1, a price fixed before we arrive
  5. The Designers Fit It

    Our team runs the ducts and sites the unit where the drawing puts them.

    MVHR installation for Hayfield homes: step 5, fitting
  6. Valves Measured, Controls Shown

    Airflow proved room by room, then a walk through the controls and reminders for the checks.

    MVHR installation for Hayfield homes: step 1, gas tightness test

Mitsubishi MVHR, specified to the size and heat loss of your house.

MVHR installation for Hayfield homes: step 1, the form and a short visit MVHR installation for Hayfield homes: step 2, a system filter as standard MVHR installation for Hayfield homes: step 4, balanced radiators MVHR installation for Hayfield homes: step 1, a price fixed before we arrive MVHR installation for Hayfield homes: step 5, fitting MVHR installation for Hayfield homes: step 1, gas tightness test
MVHR installation for Hayfield homes: boiler and radiator pipework collage: a boiler in a cupboard and radiator valves

Weavers’ Houses And Stone Slate In A 1972 Conservation Village

The village core became a conservation area in 1972, and the National Park takes in 30 of the 33 square kilometres in the parish.

Weaving shaped Hayfield’s oldest houses: their top floors held the looms, lit by long runs of mullioned windows, and stone slate still covers a high share of the roofs. Ventilation in houses like these has to work with the walls.

  • Historic interiors. Historic England’s advice says MVHR seldom suits a high-quality historic interior, and that a listed building needs consent for it as a rule. The survey tells you early if your house is one of them.

  • Stone slate roofs. A roof terminal through stone slate in the conservation area is a design question, and we settle it, with any permission, before quoting.

  • Village or valley. Planning for a house in the village centre goes to the borough council, and a farmhouse further up the valley can sit under the Park Authority instead.

You learn at the survey whether MVHR answers the damp in your house, before you pay for a unit.

Three Figures For A Hayfield MVHR Job

Timing, cover and our reply, for the diary before the survey.

  • 3 to 4
    weeks for a retrofit MVHR installation, agreed in the quote
  • 2 years
    workmanship guarantee, alongside the manufacturer’s warranty on the Mitsubishi unit
  • 1 day
    one working day from your form to hearing back from our office

A retrofit in a stone house takes longer than a new build, and your quote fixes the weeks before anyone lifts a floorboard.

MVHR installation for Hayfield homes: a fitted boiler with its casing on and a system filter beneath

“It’s just warm all the time”

Hear firsthand from our customer Fraser about how installing a heat pump has transformed his day to day living.

We’ve turned his cold 18th-century end terrace house into a comfortable, efficient home. No more waiting for the boiler to heat up the house in the morning.

Fraser’s property now sits at a consistent 19°C all year round.

Fraser, heat pump customer

Questions To Settle Before MVHR Goes Into A Hayfield Stone House

MVHR installation for Hayfield homes: a boiler pressure gauge and expansion vessel close up
  • Will it dry out the corner by the mullioned window?

    If the moisture comes from inside the house, the system draws it out of the wet rooms without a break. If water is getting through the wall, that needs a building repair first, and MVHR won’t cure it.

  • Won’t air moving all day make a stone house colder?

    The outgoing air passes its warmth to the incoming air in the core, and the valves set how much air each room gets. The heating keeps the house warm, and MVHR keeps the air fresh.

  • Does it work with the boiler we already have?

    Yes. It runs alongside whatever heats the house, and we design the two together.

  • Can the windows stay shut all winter?

    Yes. Filtered fresh air arrives on a loop, so you can keep the windows closed from the first frost to the spring.

MVHR In Hayfield: Planning, Timing And Heat Pumps

In an existing stone house, three to four weeks; a new build takes one to two. The quote fixes the weeks on site and the mess to expect before anyone starts.

It depends on the address. The village centre sits outside the Peak District National Park, so High Peak Borough Council handles it, and the Park Authority takes applications from the larger part of the parish inside the boundary. We check yours and settle the ducting routes, siting and any planning at the design stage.

In some cases. Historic England’s note accepts MVHR in some historic buildings, rules it out for the best historic interiors, and expects a listed building consent application. We tell you at the survey whether a design looks workable before any application goes in.

Yes, and the survey that measures heat loss for the heat pump feeds the ventilation design. See heat pump installation in Hayfield for the heating side. MVHR installation in New Mills covers the town our van leaves from, and MVHR installation explains the method.

Tell Us About Your Hayfield House

Where the damp shows, about how old the house is, and how to reach you. Our lead engineer looks at it before the survey.

Google Reviews From Our Customers