Skip to content
MVHR installation for High Peak homes: a white Mitsubishi Electric Lossnay MVHR unit on a raised platform in a sunny boarded loft, with insulated ducts to the gable wall and down to the rooms and its condensate drain running through a trap

MVHR Installation In The High Peak, For New Builds And Older Homes Alike

A heat recovery system designed for your house before a unit is chosen: Mitsubishi MVHR, sized room by room from the survey that measures your heating, by a local engineer.

  • Gas Safe Register mark, First Point gas engineer registration 930763
  • F-Gas Register mark, First Point registration FGAS3028681
  • Heat Geek trained
  • Stiebel Eltron certified installer
  • Which? Trusted Trader
Finance through Ideal4Finance

Spread The Cost Of Your Install

  • APR (fixed) 12.9%
  • Loans from £1 to £30,000
  • Finance over 12 to 120 months
  • Ask for finance with your quote
  • We agree any deposit with you before you apply

Representative example: £8,000 purchase, £2,000 deposit, £6,000 credit over 48 months at 12.9% APR (fixed). 48 monthly payments of £160.67. Total repayable £7,712.03. Total cost £9,712.03.

First Point Plumbing & Heating is an Introducer Appointed Representative of Ideal Sales Solutions Ltd, t/a Ideal4Finance. Ideal Sales Solutions Ltd is a credit broker and not a lender (FRN 703401). Finance available subject to status. There are risks involved in taking out a loan and you should ensure you can make all payments on time and in full; failure to do so can lead to financial difficulties and have a negative impact on your credit score.

MVHR installation for High Peak homes: an open boiler casing with the heat exchanger exposed during a service

Choose The MVHR Unit Before The Design And The Bedrooms Stay Stuffy

Fit a heat recovery unit from a catalogue and the loft hums while the rooms below go short, because the fitter never worked out what each room needed.

The bedrooms and living rooms each need their own share of fresh air, and the kitchen and bathrooms each need extract. A unit run flat out to keep up with a house it wasn’t sized for costs more to run and makes more noise.

One question worth asking any installer before you sign:

  • “Do you fit MVHR on its own, or only as part of a bigger system?”

We prefer to design it inside the heating survey, and we look at standalone MVHR case by case. Either way, the ductwork and the airflow are sized room by room before anything goes into the loft.

Heat Recovery Ventilation Across The High Peak, Sized To Your House First

Your heating designer’s survey numbers, heat loss and room volumes included, become the starting point for the ventilation.

  • Airflow assessed room by room before a unit is specified

  • Ventilation drawn on the same set of drawings as your heating

  • Mitsubishi kit, with the unit size set by your heat loss and room volumes

  • Planning checked at the design stage, whichever authority covers your address

  • One written price before work begins, with no charge for the survey

MVHR installation for High Peak homes: a white Mitsubishi Electric Lossnay MVHR unit on a raised timber platform in a boarded loft, seen from the loft hatch, with four insulated ducts taped onto its top spigots, two foil ducts running to round terminals on the stone gable and two grey ducts feeding plenums whose radial ducts drop under the loft insulation, powered from a switched fused spur on the post

One Loop, Two Duct Runs And A Core: MVHR In A High Peak Home

Scroll to watch the unit pull stale air from the wet rooms and send filtered air to the rooms you live in, with the warmth handed across in the middle.

  1. Stale Air Leaves The Wet Rooms

    Damp air is pulled out of bathrooms and kitchens and carried outside.

    • Extract Valve
    • Extract Duct
    • Exhaust Duct
    • Exhaust Terminal
    • Stale Air
  2. Fresh Air Comes Back Filtered

    Outside air comes in through the filters and is supplied to the rooms you live in.

    • Intake Terminal
    • Intake Duct
    • Supply Duct
    • Supply Valve
    • Fresh Air
  3. The Core Keeps The Warmth

    Both streams pass through the heat exchanger, so most of the warmth stays inside.

    • Heat Exchanger Core
    • Fresh Air Filter
    • Extract Filter
    • Supply Fan
    • Extract Fan
  4. Sized From The Heating Survey

    Ductwork and airflow are sized from the numbers used for your heating, so nothing is measured twice.

    • Unit
    • End Panel
    • Lid
    • Controller

Included In Your High Peak MVHR Installation

One fixed quote covers six stages, wherever in the borough the house stands.

  1. Booked By Our Office

    Say on the form whether the house is new, mid-renovation or lived in as it is. Our office replies within one working day and arranges the survey at a time that suits you.

    MVHR installation for High Peak homes: step 1, photos or a short visit
  2. Measured In Person

    Your designer visits and records the volume and airflow need of each room.

    MVHR installation for High Peak homes: step 2, a system filter as standard
  3. One Design With The Heating

    Ductwork routes, unit sizing and airflow rates sit beside your heating on one set of drawings, with the planning question answered for your address.

    MVHR installation for High Peak homes: step 1, sizing to your house
  4. The Price In Writing

    We write down the unit, the price, a start date and the disruption to expect before we order anything.

    MVHR installation for High Peak homes: step 3, a fixed quote
  5. Installed By The Designers

    The people who drew the system lay the ducts and mount the unit.

    MVHR installation for High Peak homes: step 5, fitted this week
  6. Proved At Handover

    We measure each room’s airflow against its design figure, show you the controls and add your system to our reminder list.

    MVHR installation for High Peak homes: step 6, next year’s reminder

Mitsubishi MVHR, specified once the design is drawn.

MVHR installation for High Peak homes: step 1, photos or a short visit MVHR installation for High Peak homes: step 2, a system filter as standard MVHR installation for High Peak homes: step 1, sizing to your house MVHR installation for High Peak homes: step 3, a fixed quote MVHR installation for High Peak homes: step 5, fitted this week MVHR installation for High Peak homes: step 6, next year’s reminder
MVHR installation for High Peak homes: boiler service collage: a boiler with its casing open and a flue analyser probe

First Fix On A New Estate Or Ducts Through An Old Stone House

The Valuation Office counts 43,880 homes in High Peak: 6,280 built since 2000, and 15,190 before 1919.

The age of your house sets the job. On a new build the ducts go in before the ceilings, and fitting takes 1 to 2 weeks. In a finished stone house they find their way through floors and cupboards, and a retrofit takes 3 to 4 weeks. Both get the same room-by-room design, so the airflow suits the rooms either way.

  • Inside the Peak District National Park, the Park Authority decides planning; outside it, High Peak Borough Council does. We check which applies at the design stage.

  • The borough has 32 conservation areas outside the National Park, and the two outside terminals of an MVHR system need a sensible spot on each house.

  • A home built since June 2022 has an air test result on file with building control, and a tighter house hands more heat back through the unit, so bring the certificate to the survey if you have it.

The High Peak MVHR Numbers, Before The Survey

Two counts from the Valuation Office and the two timings we quote against.

  • 6,280
    High Peak homes built since 2000, where MVHR goes in at first fix (VOA, March 2025)
  • 15,190
    High Peak homes built before 1919, where it goes in as a retrofit (VOA, March 2025)
  • 1 to 2
    weeks to fit a new build; a retrofit takes 3 to 4 weeks

Your own figure comes from the survey visit and goes into a fixed quote ahead of any order.

MVHR installation for High Peak homes: a fitted boiler with its casing on and a system filter beneath

“It’s just warm all the time”

Hear firsthand from our customer Fraser about how installing a heat pump has transformed his day to day living.

We’ve turned his cold 18th-century end terrace house into a comfortable, efficient home. No more waiting for the boiler to heat up the house in the morning.

Fraser’s property now sits at a consistent 19°C all year round.

Fraser, heat pump customer

Doubts Worth Settling Before MVHR Goes Into A High Peak Home

MVHR installation for High Peak homes: a boiler pressure gauge and expansion vessel close up
  • Will a small company actually turn up and stand behind it?

    We’re a local company, and the team that designs your system fits it. Should anything squeak once the system is running, the same team is back with you inside a week.

  • Will it replace my heating?

    It runs alongside whatever heats the house. MVHR moves the air, your heat pump or boiler keeps it warm, and we design the two together.

  • Will we still have to open the windows?

    Fresh air comes in filtered on a loop, so you can keep the windows closed from autumn to spring.

  • What will it cost?

    The design survey gives you the exact figure for your house, written into a fixed quote before we order anything. Our guide to MVHR cost and whether it’s worth it sets out the published ranges in the meantime.

High Peak MVHR Questions, Answered Before The Survey

Allow 1 to 2 weeks on a new build, where the ducts go in before the ceilings, and 3 to 4 weeks for a retrofit in a house you’re living in. The quote fixes the dates before anyone starts.

Inside the Park, the Peak District National Park Authority is the planning authority; elsewhere in the borough it’s High Peak Borough Council. We work out duct routes, unit siting and the planning rules for your address at the design stage, before we promise you anything.

New Mills, Whaley Bridge, Chapel-en-le-Frith, Chinley, Furness Vale, Hayfield, Disley, Buxton and Glossop, plus Marple and Mellor over the Stockport border. Most have their own MVHR page: New Mills, Whaley Bridge, Chapel-en-le-Frith, Chinley, Furness Vale, Hayfield, Disley, Marple and Mellor.

Yes, and we prefer it that way, because the heat loss survey feeds both. See heat pump installation in the High Peak, or the full renewables package if solar and a battery are on the list too. Our main MVHR installation page walks through how each system is designed.

Tell Us About Your High Peak House

The town, the age of the house, any building work planned, and how to reach you. Our office takes it from there.

Google Reviews From Our Customers