
MVHR Installation In Marple, For Semis Sealed Up By New Windows And Insulation
Your upgrades kept the heat in and the damp air with it. A Mitsubishi heat recovery system takes the damp air out and hands its warmth to the fresh air coming in, with each room’s airflow worked out first.
Spread The Cost Of Your Install
- APR (fixed) 12.9%
- Loans from £1 to £30,000
- Finance over 12 to 120 months
- Ask for finance with your quote
- We agree any deposit with you before you apply
Representative example: £8,000 purchase, £2,000 deposit, £6,000 credit over 48 months at 12.9% APR (fixed). 48 monthly payments of £160.67. Total repayable £7,712.03. Total cost £9,712.03.
First Point Plumbing & Heating is an Introducer Appointed Representative of Ideal Sales Solutions Ltd, t/a Ideal4Finance. Ideal Sales Solutions Ltd is a credit broker and not a lender (FRN 703401). Finance available subject to status. There are risks involved in taking out a loan and you should ensure you can make all payments on time and in full; failure to do so can lead to financial difficulties and have a negative impact on your credit score.
New Windows And A Deeper Loft Blanket Can Leave A Marple Semi Short Of Air
A post-war house got its fresh air through gaps round the old frames and floors, and the upgrades that sealed those gaps took the ventilation with them.
You notice it on a winter morning: water running down the new double glazing, a bathroom mirror that stays fogged long after the shower, and the smell of last night’s tea still in the hall. Building regulations guidance names the cause, warning that energy efficiency work can leave an older home under-ventilated.
Insulated and double glazed, the house needs another way out for the damp air. MVHR gives it one around the clock, and the core holds on to most of the heat as it goes.
Heat Recovery Ventilation In Marple, Sized For The House After The Upgrades
We take the room sizes, the heat loss and the power each room needs from the house as it stands today, upgrades and all, and design the ventilation to suit.
-
Airflow worked out room by room, extract from the kitchen and bathroom, supply to the bedrooms and living room
-
Mitsubishi units, sized for the semi as it stands after the upgrades
-
Heating and ventilation measured at one visit and drawn together
-
The price fixed in writing, with the survey visit free
-
Two years of cover from us on the fitting, with the maker’s warranty on the Mitsubishi unit as well
Where The Damp Air Goes In A Marple Semi With MVHR
Scroll the loop: wet-room air out through one duct run, filtered air into the bedrooms through the other, and the core keeping the warmth you paid for.
-
Stale Air Leaves The Wet Rooms
Damp air is pulled out of bathrooms and kitchens and carried outside.
- Extract Valve
- Extract Duct
- Exhaust Duct
- Exhaust Terminal
- Stale Air
-
Fresh Air Comes Back Filtered
Outside air comes in through the filters and is supplied to the rooms you live in.
- Intake Terminal
- Intake Duct
- Supply Duct
- Supply Valve
- Fresh Air
-
The Core Keeps The Warmth
Both streams pass through the heat exchanger, so most of the warmth stays inside.
- Heat Exchanger Core
- Fresh Air Filter
- Extract Filter
- Supply Fan
- Extract Fan
-
Sized From The Heating Survey
Ductwork and airflow are sized from the numbers used for your heating, so nothing is measured twice.
- Unit
- End Panel
- Lid
- Controller
What A Marple MVHR Installation Includes, Survey To Handover
Six stages behind one fixed price, carried out by the people who designed the system.
-
The Form
List the upgrades the house has had and the windows that stream in the mornings. Our office replies within one working day and sets up the survey.
-
Measured As It Stands
Your designer measures each room with the new windows and insulation in place, and brings no sales pitch.
-
One Design With The Heating
Your boiler or heat pump and the ventilation go on one drawing set, routes and rates included.
-
A Fixed Quote
We write the unit and the price down together before we order anything.
-
The Fit
The engineers who drew your design fit it, following the drawings.
-
Commissioned Room By Room
We check each room’s airflow against its target, explain the controls and note when the first check falls due.
Mitsubishi MVHR, ordered for your semi once the quote is agreed.
Built Between 1945 And 1982, Upgraded Since
In the Marple and Rose Hill and the Marple and Hawk Green neighbourhoods, the Valuation Office dates 3,050 of 6,020 homes to 1945 to 1982.
Houses of that age were built to breathe through their gaps. Seal them with new frames and fill and they need a planned way to move air, and that’s the job heat recovery does without throwing the heat away.
-
Approved Document F sets a minimum continuous airflow of 31 litres a second for a three-bed home and 37 for a four-bed, or 0.3 litres a second per square metre of floor if that comes out higher. We size the unit to deliver your figure at a comfortable fan speed.
-
The same guidance notes that new windows tend to make a house more airtight, and that MVHR gets more efficient as a home gets tighter.
-
An extension or a loft conversion on the way is the time to plan the duct routes, before the ceilings close.
The Marple MVHR Numbers, Before The Survey
One count from the Valuation Office, one figure from the building regulations and one from our guarantee.
-
51%
of homes in Marple and Rose Hill, and Marple and Hawk Green, built 1945 to 1982 (VOA, March 2025)
-
31 l/s
minimum continuous airflow for a three-bed home under Approved Document F
-
2 years
of workmanship cover from us, running alongside the maker’s unit warranty
The survey turns these into your own airflow target and a written price.
“It’s just warm all the time”
Hear firsthand from our customer Fraser about how installing a heat pump has transformed his day to day living.
We’ve turned his cold 18th-century end terrace house into a comfortable, efficient home. No more waiting for the boiler to heat up the house in the morning.
Fraser’s property now sits at a consistent 19°C all year round.
Four Questions Before MVHR Goes Into Your Marple Semi

-
We’ve paid to keep the heat in. Won’t fresh air let it out again?
The outgoing air warms the incoming air inside the heat exchanger, without the two streams mixing, so most of the warmth you paid to keep stays in the house.
-
Can’t we run the bathroom fan for longer?
A fan clears one room while it runs. MVHR keeps drawing damp air from the kitchen and bathroom day and night and feeds filtered air to the bedrooms, which suits a house fighting condensation.
-
Will it work with our combi boiler?
Yes. The boiler heats the house and MVHR changes the air, and we plan the two side by side.
-
Is a semi big enough to need it?
The airflow a house needs rises with its bedrooms and floor area, so the survey works out your figure. If MVHR turns out to be the wrong job for your semi, you hear that before you spend anything.
MVHR In Marple: Condensation, Timing And Cover
Plan for 3 to 4 weeks in a semi you’re living in, or 1 to 2 weeks on a new build, with the dates written into your quote.
Yes, where the moisture comes from inside: showers, cooking and washing drying indoors. A wall letting in rain from a leaking gutter needs a builder first, because MVHR won’t cure that.
Yes. One survey feeds both designs, so the ducts and the pipework each get their own route. The heating side is on our page for heat pump installation in Marple.
Yes, the same team covers Marple Bridge and Mellor. Read MVHR installation in Mellor, our MVHR cost and whether it’s worth it guide, or the main MVHR installation page for the design method.
Tell Us About Your Marple House
The upgrades you’ve done, the rooms that run with condensation, and the best number to reach you on.