Skip to content
MVHR installation for Mellor homes: a white Mitsubishi Electric Lossnay MVHR unit on a raised platform in a sunny boarded loft, with insulated ducts to the gable wall and down to the rooms and its condensate drain running through a trap

MVHR Installation In Mellor, Designed Room By Room For Old Stone Houses

In a Mellor stone house, the survey looks at the rooms where the damp gathers and whether heat recovery suits the walls. Then we size a Mitsubishi MVHR system room by room, from the same numbers as your heating.

  • Gas Safe Register mark, First Point gas engineer registration 930763
  • F-Gas Register mark, First Point registration FGAS3028681
  • Heat Geek trained
  • Stiebel Eltron certified installer
  • Which? Trusted Trader
Finance through Ideal4Finance

Spread The Cost Of Your Install

  • APR (fixed) 12.9%
  • Loans from £1 to £30,000
  • Finance over 12 to 120 months
  • Ask for finance with your quote
  • We agree any deposit with you before you apply

Representative example: £8,000 purchase, £2,000 deposit, £6,000 credit over 48 months at 12.9% APR (fixed). 48 monthly payments of £160.67. Total repayable £7,712.03. Total cost £9,712.03.

First Point Plumbing & Heating is an Introducer Appointed Representative of Ideal Sales Solutions Ltd, t/a Ideal4Finance. Ideal Sales Solutions Ltd is a credit broker and not a lender (FRN 703401). Finance available subject to status. There are risks involved in taking out a loan and you should ensure you can make all payments on time and in full; failure to do so can lead to financial difficulties and have a negative impact on your credit score.

MVHR installation for Mellor homes: an open boiler casing with the heat exchanger exposed during a service

Condensation In A Mellor Stone House Can Come From Two Places

Moisture your household makes and water coming in through the wall leave the same black corner, and a ventilation system can deal with the first of them.

Cooking, showers and washing drying on the airer put water into the air all day. With the windows shut from October, it settles on the coldest surface in the room, which in a gritstone house tends to be the outside corner behind the wardrobe. A blocked gutter or tired pointing leaves a stain that looks the same, and no fan in the loft will dry that one out.

Two things need settling before anyone prices a system: whether heat recovery suits the walls, and whether a house this old can take the ducts. You get the answer to both from the survey, before any figure goes on paper.

    Heat Recovery Ventilation In Mellor, Designed From Your Heating Survey

    The engineer who designs your heating measures the heat loss, the room volumes and the power each room needs, then designs the ventilation against those same numbers.

    • Each room’s airflow calculated before a unit is picked

    • Mitsubishi MVHR, with the unit chosen to suit the house and the heat it loses

    • Duct routes, the unit position and the two outside terminals planned at the design stage, with the conservation area in view

    • A fixed quote in writing, with the survey included

    • Two years’ workmanship cover on the install, running alongside the maker’s warranty on the unit

    MVHR installation for Mellor homes: a white Mitsubishi Electric Lossnay MVHR unit on a raised timber platform in a boarded loft, seen from the loft hatch, with four insulated ducts taped onto its top spigots, two foil ducts running to round terminals on the stone gable and two grey ducts feeding plenums whose radial ducts drop under the loft insulation, powered from a switched fused spur on the post

    Damp Air Out, Filtered Air In: The Loop Inside A Mellor House

    Scroll through the loop a heat recovery unit runs, from the wet-room extract to the filtered supply, with the core between them.

    1. Stale Air Leaves The Wet Rooms

      Damp air is pulled out of bathrooms and kitchens and carried outside.

      • Extract Valve
      • Extract Duct
      • Exhaust Duct
      • Exhaust Terminal
      • Stale Air
    2. Fresh Air Comes Back Filtered

      Outside air comes in through the filters and is supplied to the rooms you live in.

      • Intake Terminal
      • Intake Duct
      • Supply Duct
      • Supply Valve
      • Fresh Air
    3. The Core Keeps The Warmth

      Both streams pass through the heat exchanger, so most of the warmth stays inside.

      • Heat Exchanger Core
      • Fresh Air Filter
      • Extract Filter
      • Supply Fan
      • Extract Fan
    4. Sized From The Heating Survey

      Ductwork and airflow are sized from the numbers used for your heating, so nothing is measured twice.

      • Unit
      • End Panel
      • Lid
      • Controller

    What A Mellor MVHR Installation Includes

    Six stages under one fixed quote, with the same team from the survey to the controls walk-through.

    1. The Form And The Booking

      Name the rooms where the condensation gathers and what heats the house now. Our office gets back to you within one working day and books the survey visit.

      MVHR installation for Mellor homes: step 1, sizing to your house
    2. Survey And Measure

      In person and room by room, with nothing to sell you on the day and a look at whether ventilation is the right answer to the damp.

      MVHR installation for Mellor homes: step 2, flue gas analysis
    3. Designed With Your Heating

      Your heating and the ventilation share one set of drawings, from duct routes to airflow rates.

      MVHR installation for Mellor homes: step 4, balanced radiators
    4. A Fixed Quote

      The unit, the routes and the price sit in writing before we order anything.

      MVHR installation for Mellor homes: step 3, a fixed quote
    5. Fitted By The Team That Designed It

      The people who measured your rooms lay the ducts and fix the unit in place.

      MVHR installation for Mellor homes: step 5, fitted this week
    6. Commissioning And Handover

      We check the airflow at each valve against the design, run through the controls with you and set a reminder for the first check.

      MVHR installation for Mellor homes: step 6, safety tests across the boiler, plus each check the manufacturer specifies

    Mitsubishi MVHR units, chosen once the design is done and ordered once the quote is agreed.

    MVHR installation for Mellor homes: step 1, sizing to your house MVHR installation for Mellor homes: step 2, flue gas analysis MVHR installation for Mellor homes: step 4, balanced radiators MVHR installation for Mellor homes: step 3, a fixed quote MVHR installation for Mellor homes: step 5, fitted this week MVHR installation for Mellor homes: step 6, safety tests across the boiler, plus each check the manufacturer specifies
    MVHR installation for Mellor homes: boiler service collage: a boiler with its casing open and a flue analyser probe

    Old Gritstone, A Conservation Area And Room For The Ducts

    Valuation Office records date 59% of the 690 homes in the Mellor neighbourhood to before 1919, and 45% to before 1900.

    In a house that age, each duct has to find a route through finished floors and thick walls, and the walls still need to dry out. The design starts from the house you have, so the system clears the moisture without fighting the stone.

    • Stockport Council made Mellor and Moorend a conservation area in 1978 and extended it in 2007, so we plan where the two outside terminals sit before you commit to anything.

    • Mellor Hall is Grade II* listed. Historic England’s 2024 advice note says listed building consent is the normal requirement for MVHR in a listed building, and that MVHR is unlikely to suit high quality historic interiors. If your house is listed, the design starts with that question.

    • Lime-pointed stone walls move moisture through themselves, and we plan the duct routes and terminals with the conservation area rules in view.

    A Mellor House And Its MVHR Job In Three Figures

    Two figures from the Valuation Office and one from our own quotes.

    • 59%
      of homes in the Mellor neighbourhood built before 1919 (VOA, March 2025)
    • 45%
      built before 1900, the age where MVHR goes in as a retrofit through a finished house
    • 3 to 4
      weeks to fit MVHR into a finished house

    A stone house takes longer to duct than a new build, and your quote puts the weeks and the disruption on paper first.

    MVHR installation for Mellor homes: a fitted boiler with its casing on and a system filter beneath

    “It’s just warm all the time”

    Hear firsthand from our customer Fraser about how installing a heat pump has transformed his day to day living.

    We’ve turned his cold 18th-century end terrace house into a comfortable, efficient home. No more waiting for the boiler to heat up the house in the morning.

    Fraser’s property now sits at a consistent 19°C all year round.

    Fraser, heat pump customer

    Four Questions Before Heat Recovery Goes Into A Mellor Stone House

    MVHR installation for Mellor homes: a boiler pressure gauge and expansion vessel close up
    • Will MVHR clear the mould in the back bedroom?

      It pulls damp air out of the kitchen and bathrooms on a constant loop, which deals with the moisture your household makes. Water coming in through a wall needs a building repair, and MVHR won’t cure it.

    • Is it worth it in a house this draughty?

      In a leaky house, warm air also escapes through the gaps and bypasses the unit, so the heat recovery saves little on its own. MVHR earns its place in a Mellor stone house alongside insulation and draught-proofing work, or where condensation is the main problem.

    • Will it make the house colder?

      Fresh air passes the outgoing air inside the heat exchanger before it reaches your rooms, so most of the warmth stays in the house. The valves sit where the design puts them, away from where you sit.

    • Will you tell me if it doesn’t suit the house?

      Yes. If MVHR is the wrong job for your house, we say so before you spend a penny.

    MVHR In Mellor: Timing, Consent And Your Heating

    Fitting MVHR into a Mellor house you’re living in takes 3 to 4 weeks, and a new build takes 1 to 2. Your quote lists the dates and what the house will go through before anyone starts.

    For a listed building, Historic England’s advice is that listed building consent is the normal requirement. In the conservation area, we work out the duct routes, the unit position and the planning rules at the design stage, before we promise you anything.

    Yes, and it’s how we prefer to design it. One survey feeds both, so we don’t fit ductwork around heating pipework that’s already gone in. For the heat pump half, go to heat pump installation in Mellor.

    We look at standalone MVHR case by case: tell us about the house and we’ll say whether it makes sense. Our guide to MVHR cost and whether it’s worth it sets out the published figures, and our main MVHR installation page explains the method. Over the hill, see MVHR installation in Marple.

    Tell Us About Your Mellor House

    Which rooms run with condensation, what heats the house now, and how to reach you. Our office takes it from there.

    Google Reviews From Our Customers