Skip to content
Chinley solar: ten all-black solar panels in two straight rows on the clay-tiled roof of a red-brick detached house with a mock-Tudor gable, on a sunny day

Solar Panels And Battery Storage In Chinley, Sized For The Heating You’ll Have Next

We design panels and a battery for the heating your Chinley house will have next, whether it runs on oil, bottled gas or mains gas. The payback and price come on paper.

  • Gas Safe Register mark, First Point gas engineer registration 930763
  • F-Gas Register mark, First Point registration FGAS3028681
  • Heat Geek trained
  • Stiebel Eltron certified installer
  • Which? Trusted Trader
Finance through Ideal4Finance

Spread The Cost Of Solar Panels

  • APR (fixed) 12.9%
  • Loans from £1 to £30,000
  • Finance over 12 to 120 months
  • Ask for finance with your solar panel quote
  • We agree any deposit with you before you apply

Representative example: £8,000 purchase, £2,000 deposit, £6,000 credit over 48 months at 12.9% APR (fixed). 48 monthly payments of £160.67. Total repayable £7,712.03. Total cost £9,712.03.

First Point Plumbing & Heating is an Introducer Appointed Representative of Ideal Sales Solutions Ltd, t/a Ideal4Finance. Ideal Sales Solutions Ltd is a credit broker and not a lender (FRN 703401). Finance available subject to status. There are risks involved in taking out a loan and you should ensure you can make all payments on time and in full; failure to do so can lead to financial difficulties and have a negative impact on your credit score.

Chinley roofs before a solar design: ten panels on a stone house and two rows of panels on a cottage

Panels Sized For Today’s Bills Can Fall Short Once The Oil Boiler Goes

In a village where about one home in ten heats with oil or bottled gas, a solar design should know whether the heating is about to go electric.

Swap an oil or LPG boiler for a heat pump and your electricity use climbs, with most of the extra falling in winter.

A battery chosen for the lights and the kettle then looks small, and the wiring may have to be opened up a second time.

A design that knows about the heat pump from the start leaves room for it.

If the oil tank’s days are numbered, you may be asking:

  • “Should I get solar before or after a heat pump?”
  • “Will the battery be big enough once the heating goes electric?”
  • “Do I have to decide on the heat pump now?”

Tell us at the survey what heats the house now and what you plan next, and the design accounts for both.

Panels, Battery And The Heating Plan, Designed Together

Our engineer surveys your home, and our specialist install partner fits the system he designs.

  • Roof direction, pitch and shade measured on the day, with your bills to show when the house uses power

  • Battery capacity set by your daytime surplus and your tariff, with the payback written into the quote

  • SolarWatt panels and batteries, installed to our design by the partner we work with

  • Two years of workmanship cover from us, alongside the makers’ warranties

  • No system at all, if your roof or your numbers can’t justify one, and you hear that at the design stage

The service in full sits on our solar PV installation and battery storage installation pages.

Solar design for Chinley homes: an engineer by the van, an engineer with his tool belt and panels on a red-brick house

Your Usage Sets The Size, Your Roof Sets The Layout

At the roof check we go through your last few bills and work out how much you use and when you use it.

  1. Your Bills, Then Your Roof

    Your bills set the size; which way the roof faces and what shades it are measured on the day.

    • Your last few bills
    • Wall and gable
    • Roof plane
    • Ridge
    • Orientation and shade
  2. The Array Laid Out

    The panels go on course by course to fit the roof we measured.

    • Roof hooks
    • Lower rails
    • Upper rails
    • Lower course of panels
    • Upper course of panels
  3. Cable Run To The Inverter

    The cable run down to the inverter is planned with the panels.

    • Junction box
    • Cable run
    • DC isolator
    • Inverter
  4. Connection And Paperwork

    Export metering goes on last, and we handle the DNO application and the paperwork.

    • AC cable
    • AC isolator
    • Export metering
    • DNO paperwork

Six Stages In A Chinley Solar And Battery Installation

The roof check, the reminder for your first service and everything between sit inside one written price.

  1. Roof Check And Usage

    We look over the roof, its condition and its shade, then read your bills with you, along with any plan to change the heating.

    Chinley solar install, step 1: a bare slate roof before panels and a meter and two isolators
  2. Design On Paper

    Layout, battery, inverter and the payback sums, with a fixed price. A system that needs the network operator’s approval before it connects gets its application now.

    Chinley solar install, step 2: an engineer by the liveried van, a roof plan and yield chart and a First Point engineer
  3. Protection And Scaffold

    We cover lawns, paths and borders, and the scaffold goes up along the roofline.

    Chinley solar install, step 3: scaffold along the eaves, an engineer up a ladder and an engineer on a scaffolded site
  4. Array Fitted

    Our install partner puts up the rails and the panels to the layout agreed at the design stage.

    Chinley solar install, step 4: a rail on a slate roof hook and eight panels on a gritstone house
  5. Battery And Inverter

    We fit both in the dry, ventilated spot chosen with you at the survey and cable them to the panels and the consumer unit.

    Chinley solar install, step 5: an engineer in the van, a wall battery and inverter and an inverter and battery in a garage
  6. Switch-On And Handover

    We send the network operator its notice, register your warranties, show you the controls and diary the first service.

    Chinley solar install, step 6: eight panels behind a dry-stone wall and six panels on a stone semi
Chinley solar install, step 1: a bare slate roof before panels and a meter and two isolators Chinley solar install, step 2: an engineer by the liveried van, a roof plan and yield chart and a First Point engineer Chinley solar install, step 3: scaffold along the eaves, an engineer up a ladder and an engineer on a scaffolded site Chinley solar install, step 4: a rail on a slate roof hook and eight panels on a gritstone house Chinley solar install, step 5: an engineer in the van, a wall battery and inverter and an inverter and battery in a garage Chinley solar install, step 6: eight panels behind a dry-stone wall and six panels on a stone semi
Solar panels for Chinley homes: six panels on a stone semi and a white battery and inverter

Chinley Planning And Oil-To-Heat-Pump Plans, Settled At One Survey

Five conservation areas and a Park boundary through the village make Chinley planning a street-by-street question.

Two planning authorities share the parish. High Peak Borough Council covers the part outside the National Park, and the Park Authority the part inside it.

The five conservation areas sit at:

  • Buxworth
  • Chapel Milton
  • Chinley
  • Leaden Knowl
  • Wash

Roof panels on a house in one of them need no planning application in most cases. A listed house needs consent.

You get the answer for your address at the survey, before anything gets booked.

On the survey list for a Chinley house:

  • The fuel that heats the house now, and when a heat pump might replace it

  • The roof covering and its condition

  • Hillside and tree shade, mapped against each slope

  • Your bills, which show when the house uses its power

Oil and LPG homes in Blackbrook ward can take the heat pump, the panels and the battery as one system through our full renewables package, with our 2-year workmanship guarantee on the install.

Solar Figures For A Chinley Home

Three numbers from your paperwork, and one from the village’s own Census return.

  • About 1 in 10
    Blackbrook ward households heating with oil or bottled gas at the 2021 Census, the homes most likely to add a heat pump to the design
  • 26.32p
    The price-cap rate for a unit of electricity, October to December 2026; every unit of your panels’ output the house uses, at once or from the battery, is one you don’t buy
  • 70%
    The battery capacity SolarWatt guarantees at the end of a product warranty of at least 10 years in your name
  • 2 years
    Workmanship guarantee from us on the install

Settle These Before Your Chinley Roof Check

Worth settling if your home may be leaving oil behind.

Illustration of the clay-tiled roof of a red-brick detached house, before the solar panels are fittedIllustration of ten all-black solar panels fitted on rails on the clay-tiled roof of a red-brick detached house.Visualisation
Visualisation of a typical solar panel installation on a red-brick detached house. Not footage of a real job.
  • We heat with oil. Should solar wait until the heat pump goes in?

    You can do either first. If both are coming, a design that knows about the heat pump sizes the battery and the wiring for it, so nothing gets bought twice.

  • Do panels cope with the weather at this height?

    They keep generating under cloud at a lower output, and the cold doesn’t hold them back. At the roof check we work out what your roof would make before you commit.

  • Our house is on the Park side of Stubbins Lane. Can we still have panels?

    Inside the Park, planning sits with the Park Authority. Our engineer finds out at the survey whether your house needs an application, and we hold the design until you have the answer.

  • What happens if our roof turns out to be wrong for panels?

    You hear it at the survey or in the design, before you’ve spent anything.

Chinley Solar FAQs: The Park Boundary, Oil Homes And Batteries

Yes. We cover Chinley, Buxworth, Chapel Milton and the rest of the High Peak.

That depends on your side of the National Park boundary, which runs up Stubbins Lane and part of Maynestone Road. Inside the Park it’s the Park Authority and outside it High Peak Borough Council, and the survey confirms which before any design work.

Around a week on site after the design and the price are settled, or a single day if you only need a battery on existing panels.

Yes. Mention the heat pump at the survey and we size the battery and leave room in the wiring for it to join.

Somewhere dry and ventilated that we agree with you at the survey, cabled to the panels and the consumer unit.

We handle it with our install partner: an application before fitting where the system needs the operator’s approval, and a notice after switch-on where it doesn’t.

Tell Us About The House And The Heating

Your Chinley address, what you heat with now and the best number to reach you. We’ll set up the roof check from there.

Our office gets back to you within one working day, and the phones are staffed 9am to 3pm, Monday to Friday.