Skip to content
Ten all-black solar panels in two straight rows on the clay-tiled roof of a red-brick detached house with a mock-Tudor gable, on a sunny day

Solar Panels And Battery Storage In Hazel Grove, Sized So Less Goes To The Grid

On Outgoing Octopus, your Hazel Grove panels earn about 12p for each unit exported, and a unit bought after dark costs 26.32p. We size panels and battery to keep more output at home.

  • Gas Safe Register mark, First Point gas engineer registration 930763
  • F-Gas Register mark, First Point registration FGAS3028681
  • Heat Geek trained
  • Stiebel Eltron certified installer
  • Which? Trusted Trader
Finance through Ideal4Finance

Spread The Cost Of Solar Panels

  • APR (fixed) 12.9%
  • Loans from £1 to £30,000
  • Finance over 12 to 120 months
  • Ask for finance with your solar panel quote
  • We agree any deposit with you before you apply

Representative example: £8,000 purchase, £2,000 deposit, £6,000 credit over 48 months at 12.9% APR (fixed). 48 monthly payments of £160.67. Total repayable £7,712.03. Total cost £9,712.03.

First Point Plumbing & Heating is an Introducer Appointed Representative of Ideal Sales Solutions Ltd, t/a Ideal4Finance. Ideal Sales Solutions Ltd is a credit broker and not a lender (FRN 703401). Finance available subject to status. There are risks involved in taking out a loan and you should ensure you can make all payments on time and in full; failure to do so can lead to financial difficulties and have a negative impact on your credit score.

a red-brick detached house with eight roof panels, a meter with two isolator switches, and a stone semi with six roof panels homes, for a Hazel Grove home

A Roof Full Of Panels Can Send Most Of Its Output To The Grid

Size a system to fill the roof and most of what it makes leaves the house, while you buy your evening power back at more than twice the rate.

The worked example on our solar page follows a household that’s in for half the day. Of the 3,527 units a 4 kWp roof makes in a year, it uses 874 at home and exports the other 2,653.

On Outgoing Octopus, which pays only Octopus electricity customers, each exported unit earns about 12p. Each unit you buy after dark costs 26.32p under the October to December 2026 price cap.

Add panels past what the house can use and the extra output earns the lower rate.

Worth asking before any roof gets filled:

  • “Will most of our power just go to the grid?”
  • “What size battery would keep it in the house?”

Your bills come first in our design, and the battery size follows from how much daytime output would otherwise go to the grid.

A Hazel Grove Design That Keeps More Of Your Output At Home

Our engineer reads your bills with you and measures the roof, and our specialist install partner fits the system he designs.

  • Your bills and the hours you’re in, talked through at the survey, so the panel count matches what the house can use

  • A battery sized to keep daytime surplus off the grid and run the house after dark, or left out when your numbers don’t support one

  • Roof direction, pitch and shade measured on the day

  • SolarWatt for both the panels and the battery, with the payback sums set out in your quote

  • Two years of workmanship cover from us on the fitting, running alongside the kit warranties

How we handle the rest of the job, from survey to handover, is on our battery storage installation and solar PV installation pages.

a detached stone house with ten roof panels beside an outbuilding, a stone cottage with one row of five panels, and a detached stone house with eight panels behind a drystone wall, like many homes, for a Hazel Grove home

See How Your Usage Shapes A Hazel Grove System

Scroll through the order we design in: your bills and your weekday pattern first, then the roof, the cable run to the inverter and the connection paperwork.

  1. Your Usage Comes First

    We start with your usage: the bills show how much power the house takes and when, which tells us how much a battery could move into the evening.

    • Your last few bills
    • Wall and gable
    • Roof plane
    • Ridge
  2. Your Roof On A Plan

    Pitch, direction and shade then go onto a plan of your roof, and the panel layout keeps clear of the shaded corners.

    • Orientation and shade
    • Roof hooks
    • Lower rails
    • Upper rails
    • Lower course of panels
    • Upper course of panels
  3. Surplus And Tariff Size The Battery

    Your daytime surplus and your tariff set the battery’s capacity.

    • Battery base
    • Module one
    • Module two
    • Module three
    • Module four
    • Top cover
  4. Inverter And Paperwork

    The design places the inverter, notes whether the network operator wants a notice after fitting or its approval before, and goes into your quote whole.

    • Junction box
    • Cable run
    • DC isolator
    • Inverter
    • Battery cable
    • AC cable
    • AC isolator
    • Export metering
    • Network operator notice

A Hazel Grove Solar And Battery Install, Six Steps On One Price

The survey, the design and the fitting, all on a price that holds to the invoice.

  1. Survey At The House

    Our engineer goes through your bills and the hours you’re out, then measures the roof’s direction, pitch and shade and checks its condition.

    Detached gritstone house with a bare slate roof, before any panels go on
  2. Written Design

    Panels, battery, inverter and the payback go into a fixed quote. A system the network operator must approve first gets its application at this stage.

    Roof plan, yield chart and quote sheet drawn in plain grey lines on a farmhouse table
  3. Ground Covered, Scaffold Up

    Before any scaffold goes up to the eaves, we lay sheets over your drive, path and borders.

    Scaffold with guard rails along the eaves of a stone house, ground sheets on the path below
  4. Rails And Panels

    Our install partner clamps the rails to roof hooks and lays each panel where the design puts it.

    Edge of a finished black solar array on a slate roof, gutter below and hills beyond
  5. Battery And Inverter In

    Battery and inverter go where the survey put them, out of the damp and with air around them, and our install partner cables them to the panels and the consumer unit.

    Garage wall with an inverter, isolators, a floor-standing battery and the consumer unit
  6. Live And Handed Over

    We let the network operator know the system is running, put each warranty in your name, take you through the controls and diary your first service reminder.

    Electricity meter and two isolator switches on a painted block wall, with cables in white trunking
Detached gritstone house with a bare slate roof, before any panels go on Roof plan, yield chart and quote sheet drawn in plain grey lines on a farmhouse table Scaffold with guard rails along the eaves of a stone house, ground sheets on the path below Edge of a finished black solar array on a slate roof, gutter below and hills beyond Garage wall with an inverter, isolators, a floor-standing battery and the consumer unit Electricity meter and two isolator switches on a painted block wall, with cables in white trunking
four First Point engineers by a van, a stone semi with six roof panels, and a panel rail clamped to a hook under the slates homes, for a Hazel Grove home

Semis, A Stockport Postcode And The Rules For Your Roof

Stockport Council handles planning in Hazel Grove, and the survey checks your address before the layout goes any further.

Semis are the commonest home in Hazel Grove ward: 2,699 of its 6,066 households lived in one at the 2021 Census. On a semi, the design keeps to your half of the slope.

Roof panels on a house count as permitted development, so a typical Hazel Grove semi needs no planning application. A listed house, or a building within its grounds, needs consent first.

Those answers set the panel count and the battery, so the payback in your quote matches the way your house uses power.

A gas boiler close to replacement is worth raising at the survey. Our full renewables package sizes a heat pump, the panels and the battery as one system.

Our Disley solar page covers the next village along the A6, with High Lane in between.

Hazel Grove Solar Figures: Daytime Output Against Evening Power

Two rates that decide what each panel is worth to you, and two figures that come from us.

  • 12p
    What Outgoing Octopus pays Octopus customers for each unit your panels send to the grid
  • 26.32p
    What each unit you buy costs under the October to December 2026 price cap, and so the value of each unit of your own output you use, at the time or from the battery
  • 2 years
    Workmanship cover from us on the fitting, running alongside the kit warranties
  • One day
    A battery added to an existing array; new panels plus a battery take about a week

Hazel Grove Solar Doubts To Settle Before The Survey

For houses that empty out on weekdays, and for the ones that don’t.

Illustration of the clay-tiled roof of a red-brick detached house, before the solar panels are fittedIllustration of ten all-black solar panels fitted on rails on the clay-tiled roof of a red-brick detached house.Visualisation
Visualisation of a typical solar panel installation on a red-brick detached house. Not footage of a real job.
  • We’re both out at work. Can solar still pay for us?

    It can. Running the washing machine on a timer in daylight raises how much of your own power you use, and a battery moves the rest into the evening.

    Your quote sets out the payback for the system we propose, and if the sums don’t add up, you hear that first.

  • Can we have panels now and a battery later?

    Yes. Tell us at the survey and we design the wiring to take a battery later, so you don’t pay for a second survey.

  • We have no garage. Where would the battery go?

    Anywhere dry and ventilated that suits you; we pick the place together at the survey, and the design marks it along with the cable route to the panels and the consumer unit.

  • If something goes wrong after the install, who do we call?

    First Point. The engineer who designed your system already knows its layout, and the install sits under our 2-year workmanship guarantee.

Hazel Grove Solar Panel And Battery FAQs

Yes. We cover both, along with the stretch of the A6 between Hazel Grove and Disley.

The install team needs about a week at the house, and that starts once you’ve agreed the design and price. If your roof already has panels, our install partner adds the battery in one day.

Permitted development covers panels on a house roof that stay below the ridge and within 0.2 metres of the slope, so you make no application. A listed house needs consent first, and the survey checks your address before the design is drawn.

Yes. The battery takes the surplus your panels make while you’re out and supplies the house after dark, and we size it to your evening use.

No VAT applies at the moment. HMRC’s energy-saving materials relief puts home solar and batteries at 0% until 31 March 2027.

We do. The size of the system sets the route: above the operator’s threshold, we apply for approval as soon as you sign the design; below it, we send the notice after switch-on.

Tell Us About Your Hazel Grove House

Your address, roughly what you spend on electricity, and how to reach you. Our office rings to fix a survey date.

Weekday office hours are 9am to 3pm, and you hear back within one working day.

Google Reviews From First Point Customers