Skip to content
Marple solar: ten all-black solar panels in two straight rows on the clay-tiled roof of a red-brick detached house with a mock-Tudor gable, on a sunny day

Solar Panels And Battery Storage In Marple, Sized From Your Bills First

Your Marple system starts from the power your house uses and when it uses it, then the roof, then the battery, and you see the payback and a fixed price before you commit.

  • Gas Safe Register mark, First Point gas engineer registration 930763
  • F-Gas Register mark, First Point registration FGAS3028681
  • Heat Geek trained
  • Stiebel Eltron certified installer
  • Which? Trusted Trader
Finance through Ideal4Finance

Spread The Cost Of Solar Panels

  • APR (fixed) 12.9%
  • Loans from £1 to £30,000
  • Finance over 12 to 120 months
  • Ask for finance with your solar panel quote
  • We agree any deposit with you before you apply

Representative example: £8,000 purchase, £2,000 deposit, £6,000 credit over 48 months at 12.9% APR (fixed). 48 monthly payments of £160.67. Total repayable £7,712.03. Total cost £9,712.03.

First Point Plumbing & Heating is an Introducer Appointed Representative of Ideal Sales Solutions Ltd, t/a Ideal4Finance. Ideal Sales Solutions Ltd is a credit broker and not a lender (FRN 703401). Finance available subject to status. There are risks involved in taking out a loan and you should ensure you can make all payments on time and in full; failure to do so can lead to financial difficulties and have a negative impact on your credit score.

Marple roofs before a solar design: six panels on a stone semi above a lane and an inverter above a floor battery in a garage

Your Bills Should Set The Size Of A Marple Solar System

A post-war semi can take a lot of panels, and a quote that fills the roof without reading your usage can sell you more than the house will use.

If the house uses most of its power in the evening, a roof full of panels sends much of its midday output to the grid. A battery picked from a brochure may run dry before bedtime.

Electric heating moves the sums again. At the 2021 Census, 187 households in Marple and Rose Hill heated their homes that way.

Faced with a quote for the full roof, it’s fair to ask:

  • “Do I need panels on the whole roof?”
  • “What size battery do I actually need?”
  • “Will most of my power just go to the grid?”

We start the design from your bills, then the roof, then the battery.

A Marple Design Built From Your Usage Up

Our engineer surveys the roof, and our specialist install partner fits the system he specifies.

  • Your bills read first, so the system matches how much power you use and when

  • Roof pitch, direction and shade measured, with the layout drawn to suit

  • SolarWatt panels and a SolarWatt battery, fitted by our install partner to the plan

  • Two years of workmanship guarantee from us, on top of the kit warranties

  • If the numbers won’t work for your house, we say so before you spend anything

The service is set out in full on our solar PV installation and battery storage installation pages.

Solar design for Marple homes: an engineer with his tool belt, panels behind a stone wall and an engineer in the van

Your Usage Sets The Size, Your Roof Sets The Layout

At the roof check we go through your last few bills and work out how much you use and when you use it.

  1. Your Bills, Then Your Roof

    Your bills set the size; which way the roof faces and what shades it are measured on the day.

    • Your last few bills
    • Wall and gable
    • Roof plane
    • Ridge
    • Orientation and shade
  2. The Array Laid Out

    The panels go on course by course to fit the roof we measured.

    • Roof hooks
    • Lower rails
    • Upper rails
    • Lower course of panels
    • Upper course of panels
  3. Cable Run To The Inverter

    The cable run down to the inverter is planned with the panels.

    • Junction box
    • Cable run
    • DC isolator
    • Inverter
  4. Connection And Paperwork

    Export metering goes on last, and we handle the DNO application and the paperwork.

    • AC cable
    • AC isolator
    • Export metering
    • DNO paperwork

What’s Included When We Fit Solar And A Battery In Marple

One quote, one price, and every stage listed on it.

  1. Bills And Roof

    We go through your bills to see when you use power, then check the roof’s direction, pitch, shade and condition.

    Marple solar install, step 1: a bare slate roof before panels, an engineer by the van and a meter and two isolators
  2. Design With The Payback

    Layout, battery, inverter and payback in writing, with a fixed price. For a system the network operator must approve first, the application goes in now.

    Marple solar install, step 2: a roof plan and yield chart, a First Point engineer and an engineer on a scaffolded site
  3. Covers And Scaffold

    The drive, paths and borders get covered, and the scaffold goes up at the eaves.

    Marple solar install, step 3: an engineer by the liveried van, scaffold along the eaves and an engineer at a garden gate
  4. Panels Fitted

    Our install partner fits the rails and the panels to the layout in your design.

    Marple solar install, step 4: a panel rail clamped to a slate roof hook and black panels on a red-brick detached house
  5. Battery Installed

    The battery and the inverter go in the dry, ventilated spot we agreed with you, cabled to the panels and the consumer unit.

    Marple solar install, step 5: ten panels on a stone house and eight panels on a gritstone house
  6. Switch-On And Handover

    We send the network operator its notice, register the warranties to you, show you the controls and set a reminder for the first service.

    Marple solar install, step 6: five panels on a stone cottage and the edge of a black array
Marple solar install, step 1: a bare slate roof before panels, an engineer by the van and a meter and two isolators Marple solar install, step 2: a roof plan and yield chart, a First Point engineer and an engineer on a scaffolded site Marple solar install, step 3: an engineer by the liveried van, scaffold along the eaves and an engineer at a garden gate Marple solar install, step 4: a panel rail clamped to a slate roof hook and black panels on a red-brick detached house Marple solar install, step 5: ten panels on a stone house and eight panels on a gritstone house Marple solar install, step 6: five panels on a stone cottage and the edge of a black array
Solar panels for Marple homes: twelve panels on a large stone house and a white battery and inverter

Stockport Planning And Post-War Semis, Sized From Your Bills

Marple sits on the Stockport side of the county line, and Stockport Council handles planning across the town.

About half of Marple’s homes date from 1945 to 1982, with semis the commonest type (Valuation Office).

Stockport lists four conservation areas in the town, All Saints Marple and the two canals among them. Inside one, a semi’s pitched roof can carry panels with no planning application in most cases.

A listed house needs consent, and our engineer checks your address at the survey.

Before we fill a slope, we look at:

  • Your usage and tariff, so you buy no battery capacity you won’t use

  • Your half of a shared roof and the chimney on it

  • Electric heating, if you have it, which changes the payback sums

  • Roof pitch, direction and shade

Swapping the boiler for a heat pump later? Put all three in our full renewables package and the payback in your fixed written quote counts its electricity too.

Marple Solar Figures To Hold Against Your Bills

Three numbers from your paperwork, and one from the town’s Census return.

  • 187
    Households in Marple and Rose Hill heating with electricity alone at the 2021 Census, about 6% of the area, where electricity carries the heating as well as everything else
  • 26.32p
    Per unit of electricity under the price cap for October to December 2026, so each unit of panel output the house uses, then or from the battery, is worth that much to you
  • 70%
    What the battery still guarantees to hold when its product warranty, at least 10 years and in your name, ends
  • 2 years
    The guarantee we give on our workmanship

Marple Solar Doubts To Settle First

Answers for semi owners, before the roof check.

Illustration of the clay-tiled roof of a red-brick detached house, before the solar panels are fittedIllustration of ten all-black solar panels fitted on rails on the clay-tiled roof of a red-brick detached house.Visualisation
Visualisation of a typical solar panel installation on a red-brick detached house. Not footage of a real job.
  • Our semi shares a roof with next door. Can we have panels on our half?

    Yes. We keep the layout to your half of the slope and work around your chimney and any roof windows.

  • We heat with electric heaters. Does solar help?

    Each unit of panel output the house uses, at the time or from the battery, is one you don’t buy at the 26.32p cap rate.

    Electric heating raises your usage most in winter, when panels make the least. Your quote shows what that means for your bills.

  • Does a battery make sense without a heat pump?

    A battery moves daytime surplus into the evening, so the sums depend on your usage after dark and your tariff. We set them out in the quote.

  • What if the survey shows solar won’t pay for our house?

    Then you hear it at the survey or in the design, and you’ve spent nothing.

Marple Solar Panel FAQs: Semis, Stockport Planning And Batteries

Yes. We cover Marple, and Rose Hill and Hawk Green as well.

Stockport Council. Panels on a pitched roof in the All Saints, Station Road and Winnington Road, or canal conservation areas are permitted development, so most homes there make no application; a listed house needs consent, and the survey checks your address first.

About a week on site for panels and a battery, once the design and the price are settled. Fitting a battery to existing panels takes one day.

We agree a dry, ventilated place for it with you at the survey, and the design sets its position and the cable route to the panels and the consumer unit.

We do, with our install partner. The operator approves larger systems before fitting, so we apply at the design stage; smaller ones need a notice after switch-on, which we send.

Yes. We check the make of your system first, because the battery has to work with it, and some systems need a compatible battery from another maker.

Tell Us About Your Marple Home

Your address, what heats the house now and how to reach you. Our office books the survey, and the bills-first design follows.

We answer within one working day; the office is open 9am to 3pm, Monday to Friday.

Reviews From Marple And Around