Skip to content
Mellor solar: ten all-black solar panels in two straight rows on the clay-tiled roof of a red-brick detached house with a mock-Tudor gable, on a sunny day

Solar Panels And Battery Storage In Mellor, With Every Roof Slope Measured

We measure each slope of your Mellor roof and read your bills, so the panels go where they pay and the battery fits your evenings. The price and payback come in writing.

  • Gas Safe Register mark, First Point gas engineer registration 930763
  • F-Gas Register mark, First Point registration FGAS3028681
  • Heat Geek trained
  • Stiebel Eltron certified installer
  • Which? Trusted Trader
Finance through Ideal4Finance

Spread The Cost Of Solar Panels

  • APR (fixed) 12.9%
  • Loans from £1 to £30,000
  • Finance over 12 to 120 months
  • Ask for finance with your solar panel quote
  • We agree any deposit with you before you apply

Representative example: £8,000 purchase, £2,000 deposit, £6,000 credit over 48 months at 12.9% APR (fixed). 48 monthly payments of £160.67. Total repayable £7,712.03. Total cost £9,712.03.

First Point Plumbing & Heating is an Introducer Appointed Representative of Ideal Sales Solutions Ltd, t/a Ideal4Finance. Ideal Sales Solutions Ltd is a credit broker and not a lender (FRN 703401). Finance available subject to status. There are risks involved in taking out a loan and you should ensure you can make all payments on time and in full; failure to do so can lead to financial difficulties and have a negative impact on your credit score.

Mellor roofs before a solar design: two rows of panels on a cottage and eight panels on a gritstone house

On A Detached Mellor House, Find The Right Slope Before Anyone Fits Panels

Four in ten Mellor homes are detached, and an old gritstone house can give a quote several roof slopes to choose from.

A quote might put the panels on the slope that faces the lane, or on the biggest one. It can miss a smaller slope that keeps its sun all afternoon.

On a hillside, trees, outbuildings and the rise of the land each shade a roof at different hours. A battery sized off the wrong slope sits half full.

With several slopes to pick from, you might wonder:

  • “Which side of the roof gets the sun longest?”
  • “Will the trees shade the panels in the afternoon?”

We measure each slope you have, and the design uses the ones that pay.

One Design For The Whole House In Mellor

Our engineer surveys every slope, and our specialist install partner fits the layout he chooses.

  • Each roof slope measured for direction, pitch and shade, with your bills read alongside

  • Panels on the slopes that earn their keep, and a battery matched to your evenings

  • SolarWatt panels and batteries, fitted by our partner to our design

  • Our two-year workmanship guarantee, separate from the makers’ warranties

  • A turn-down at the design stage, before you pay anything, if the house isn’t a fit

Our solar PV installation and battery storage installation pages set out each part of the service.

Solar design for Mellor homes: ten panels on a stone house, a First Point engineer and an engineer at a garden gate

Your Usage Sets The Size, Your Roof Sets The Layout

At the roof check we go through your last few bills and work out how much you use and when you use it.

  1. Your Bills, Then Your Roof

    Your bills set the size; which way the roof faces and what shades it are measured on the day.

    • Your last few bills
    • Wall and gable
    • Roof plane
    • Ridge
    • Orientation and shade
  2. The Array Laid Out

    The panels go on course by course to fit the roof we measured.

    • Roof hooks
    • Lower rails
    • Upper rails
    • Lower course of panels
    • Upper course of panels
  3. Cable Run To The Inverter

    The cable run down to the inverter is planned with the panels.

    • Junction box
    • Cable run
    • DC isolator
    • Inverter
  4. Connection And Paperwork

    Export metering goes on last, and we handle the DNO application and the paperwork.

    • AC cable
    • AC isolator
    • Export metering
    • DNO paperwork

A Mellor Solar And Battery Install, Everything Included

Six stages and a fixed price, with the time on site agreed before work starts.

  1. Slopes And Usage

    We measure each roof slope for direction, pitch, shade and condition, and read your bills with you.

    Mellor solar install, step 1: a bare slate roof, an engineer in our hoodie and a meter and two isolators
  2. Your Design In Writing

    The layout, the battery, the inverter and the payback, with a fixed price. Larger systems need the network operator’s approval before they connect, and we send that application with the design.

    Mellor solar install, step 2: an engineer in the van, a roof plan and yield chart and an engineer with his tool belt
  3. Scaffold, Garden Protected

    We cover the garden and the paths, then raise the scaffold along the slopes being fitted.

    Mellor solar install, step 3: an engineer by the liveried van, scaffold along the eaves and an engineer up a ladder
  4. Panels On

    Our install partner fits the rails and the panels to the slopes and the layout in your design.

    Mellor solar install, step 4: a rail on a slate roof hook and eight panels behind a dry-stone wall
  5. Battery And Inverter

    We place both in the dry, ventilated spot agreed at the survey and cable them to the panels and the consumer unit.

    Mellor solar install, step 5: a garage battery, a wall battery and inverter and an engineer by the scaffold
  6. Handover

    The network operator hears the system is live and the warranties go into your name; we take you through the controls and set the first-service reminder.

    Mellor solar install, step 6: six panels on a stone semi with a hill behind and five panels in one row on a stone cottage
Mellor solar install, step 1: a bare slate roof, an engineer in our hoodie and a meter and two isolators Mellor solar install, step 2: an engineer in the van, a roof plan and yield chart and an engineer with his tool belt Mellor solar install, step 3: an engineer by the liveried van, scaffold along the eaves and an engineer up a ladder Mellor solar install, step 4: a rail on a slate roof hook and eight panels behind a dry-stone wall Mellor solar install, step 5: a garage battery, a wall battery and inverter and an engineer by the scaffold Mellor solar install, step 6: six panels on a stone semi with a hill behind and five panels in one row on a stone cottage
Solar panels for Mellor homes: panels on a house and garage and an inverter and floor battery

Old Stone Houses Under Stockport Rules, Measured Slope By Slope

More than half of Mellor’s homes went up before 1919, and Mellor Hall, listed Grade II*, sits inside the village’s conservation area.

Mellor has been part of Stockport since 1974, so Stockport Council handles planning.

The Mellor/Moorend conservation area takes in Moorend, Brook Bottom and the land around St Thomas’ Church and Mellor Hall.

Mellor Hall, or any other listed house, needs consent for panels. Most roofs inside the conservation area take them without a planning application, and you know where you stand from survey day.

Our engineer then looks at:

  • Each slope and its covering, to find the ones that pay

  • Trees, outbuildings and the rise of the hill, for the shade each casts

  • Your bills, which set how much the battery should store

  • Your oil or LPG boiler, if a heat pump is due to replace it

On an oil or LPG home, a heat pump can join the panels and the battery in our full renewables package, and the 2-year workmanship guarantee on the install comes from us.

Mellor Solar Figures, Before You Book

Four numbers, one of them about the village itself.

  • 1 in 9
    Mellor households heating with oil or bottled gas alone at the 2021 Census (70 of 636), the homes where a heat pump changes the design most
  • 26.32p
    The unit rate for electricity under the price cap, October to December 2026; panel output the house uses, live or stored in the battery, saves buying units at that rate
  • 10 years or more
    The length of the battery’s product warranty, registered to you; 70% of its capacity is guaranteed at the end
  • About a week
    On site for panels and a battery; a battery on its own takes a day

Mellor Solar Doubts, Settled Up Front

Settle these four points on an older stone house before the survey.

Illustration of the clay-tiled roof of a red-brick detached house, before the solar panels are fittedIllustration of ten all-black solar panels fitted on rails on the clay-tiled roof of a red-brick detached house.Visualisation
Visualisation of a typical solar panel installation on a red-brick detached house. Not footage of a real job.
  • Our house is in the Mellor/Moorend conservation area. Can we still have panels?

    You can, and on a pitched roof you won’t need a planning application in most cases. A listed house needs consent first, so we check your address at the survey, and if an application is needed, the install follows the decision.

  • We’re on oil. Should the heat pump or the solar come first?

    Either order works. If both are coming, design them together so nothing gets bought twice, and our full renewables package does that.

  • Is solar worth it without the heat pump?

    We work out the payback for the house as it runs today, and add the heat pump if you ask. If the numbers fall short, you hear it before you spend anything.

  • Our garden is on a steep slope. Can scaffold still go up?

    Yes. We plan the access on the slope at the survey, and the garden goes under covers before the scaffold does.

Mellor Solar FAQs: Older Houses, Oil And Stockport Planning

Yes, and we cover Moorend, Brook Bottom and the farms around the village too.

Expect about a week on site after the design and the price are settled; a battery for existing panels takes a day.

Stockport Council. Inside the Mellor/Moorend conservation area, roof panels fall under permitted development, so there is no application to make in most cases; a listed building needs consent, and the survey checks your address before any design work.

Yes. Mention it at the survey and we leave room in the battery sizing and the wiring for the heat pump to join.

In a dry, ventilated spot we agree with you at the survey, with the cable route to the panels and the consumer unit set in the design.

We do, with our install partner. A system that needs the operator’s approval gets an application before fitting, and one that needs only a notice gets it after switch-on.

Tell Us About Your Mellor House And Its Roofs

The address, what heats the house today and the best number to reach you. Our office arranges the survey.

You’ll get a reply within one working day. Office hours run 9am to 3pm, Monday to Friday.

What Customers Between Marple And New Mills Say