Skip to content
Solar panels and battery storage in New Mills: ten all-black solar panels in two straight rows on the clay-tiled roof of a red-brick detached house with a mock-Tudor gable, on a sunny day

Solar Panels And Battery Storage In New Mills, Designed By A Local Team

We work out what panels and a battery would do for your New Mills house from your own roof and bills. You see the numbers before you sign anything.

  • Gas Safe Register mark, First Point gas engineer registration 930763
  • F-Gas Register mark, First Point registration FGAS3028681
  • Heat Geek trained
  • Stiebel Eltron certified installer
  • Which? Trusted Trader
Finance through Ideal4Finance

Spread The Cost Of Solar Panels

  • APR (fixed) 12.9%
  • Loans from £1 to £30,000
  • Finance over 12 to 120 months
  • Ask for finance with your solar panel quote
  • We agree any deposit with you before you apply

Representative example: £8,000 purchase, £2,000 deposit, £6,000 credit over 48 months at 12.9% APR (fixed). 48 monthly payments of £160.67. Total repayable £7,712.03. Total cost £9,712.03.

First Point Plumbing & Heating is an Introducer Appointed Representative of Ideal Sales Solutions Ltd, t/a Ideal4Finance. Ideal Sales Solutions Ltd is a credit broker and not a lender (FRN 703401). Finance available subject to status. There are risks involved in taking out a loan and you should ensure you can make all payments on time and in full; failure to do so can lead to financial difficulties and have a negative impact on your credit score.

New Mills roofs before a solar design: eight panels on a gritstone house and six panels on a stone semi

On A Gorge-Side Roof, Shade Decides How Many Panels Earn Their Place

New Mills climbs both sides of the Torrs, so two houses on one street can see the sun for different hours.

Some homes here sit one above another on the slope, each entered from its own street. The hillside opposite can take the low winter sun off a roof long before it leaves the house above.

A quote priced from a postcode has no way of seeing that, or the chimney stack two doors along.

Panels fitted into that shadow cost the same as panels in full sun and make far less. The battery behind them sits half empty.

On a sloping street, the questions are about shade:

  • “Does my roof get enough sun for panels?”
  • “Will the hill opposite block the winter sun?”
  • “How many panels are worth fitting?”

Our engineer measures the pitch, the direction and the shade on your roof before a single panel goes on the plan.

A Solar Design Drawn Up Inside The Town

Our own engineer signs off the design, and our specialist install partner fits to it.

  • Your roof measured for pitch, direction and shade, and your usage read from your own bills

  • Panels and battery sized to the house, with the payback worked through in the quote

  • Panels and batteries from SolarWatt, the kit we specify

  • Two years of workmanship cover from us, on top of the panel and battery warranties

  • A plain no before you spend a penny, if the roof or the numbers won’t carry a system

Read the rest on our solar PV installation and battery storage installation pages.

Solar design for New Mills homes: a First Point engineer, panels behind a stone wall and an engineer with his tool belt

Your Usage Sets The Size, Your Roof Sets The Layout

At the roof check we go through your last few bills and work out how much you use and when you use it.

  1. Your Bills, Then Your Roof

    Your bills set the size; which way the roof faces and what shades it are measured on the day.

    • Your last few bills
    • Wall and gable
    • Roof plane
    • Ridge
    • Orientation and shade
  2. The Array Laid Out

    The panels go on course by course to fit the roof we measured.

    • Roof hooks
    • Lower rails
    • Upper rails
    • Lower course of panels
    • Upper course of panels
  3. Cable Run To The Inverter

    The cable run down to the inverter is planned with the panels.

    • Junction box
    • Cable run
    • DC isolator
    • Inverter
  4. Connection And Paperwork

    Export metering goes on last, and we handle the DNO application and the paperwork.

    • AC cable
    • AC isolator
    • Export metering
    • DNO paperwork

Included In Your New Mills Solar And Battery Installation

One written price covers the job, from the roof check to the reminder for your first service.

  1. Roof And Bills

    We look at the roof’s direction, shade and condition, and go through your bills with you to see when the house uses its power.

    New Mills solar install, step 1: a bare slate roof before panels, an engineer by the van and a meter and two isolators
  2. Design And Fixed Price

    The panel layout, battery and inverter go into a written design with the payback maths and a price that holds to the invoice. If the network operator has to approve the system before it connects, we send the application now.

    New Mills solar install, step 2: an engineer on a scaffolded site, a roof plan and yield chart and an engineer in the van
  3. Scaffold And Cover

    Paths and borders get covered before the scaffold goes up, on the access we planned at the survey for your stretch of hillside.

    New Mills solar install, step 3: scaffold along the eaves, an engineer at a garden gate and an engineer up a ladder
  4. Rails, Then Panels

    Our specialist install partner fixes the rails and then the panels to the layout on your plan.

    New Mills solar install, step 4: the edge of a black array and panels on a house and garage
  5. Battery And Inverter

    Both go in the dry, ventilated spot we agreed with you at the survey, cabled to the panels and your consumer unit.

    New Mills solar install, step 5: a rail on a slate roof hook and a white battery and inverter
  6. Live And Handed Over

    We tell the network operator the system is running, register the warranties in your name, show you the controls and book in a reminder for the first service.

    New Mills solar install, step 6: an engineer by our van, an inverter and floor battery and a wall battery and inverter
New Mills solar install, step 1: a bare slate roof before panels, an engineer by the van and a meter and two isolators New Mills solar install, step 2: an engineer on a scaffolded site, a roof plan and yield chart and an engineer in the van New Mills solar install, step 3: scaffold along the eaves, an engineer at a garden gate and an engineer up a ladder New Mills solar install, step 4: the edge of a black array and panels on a house and garage New Mills solar install, step 5: a rail on a slate roof hook and a white battery and inverter New Mills solar install, step 6: an engineer by our van, an inverter and floor battery and a wall battery and inverter
Solar panels for New Mills homes: twelve panels on a large stone house and ten panels on a stone house

Solar Panels On Gritstone Terraces And In A New Mills Conservation Area

We’re a New Mills company, and one team handles the survey, the planning answer and any return visit.

The town centre has been a conservation area since 1985, its terraces built of gritstone under Welsh slate.

Panels on those slate roofs need no planning application for most houses. Two cases differ:

  • A listed building needs consent.
  • A wall facing the street needs full permission.

We tell you at the survey, and we book the fitting once any permission is in place.

On a New Mills roof, our engineer measures:

  • The slope that keeps its sun past the stacks and the Torrs

  • Your share of a terrace roofline, with the array kept to your side

  • The slate’s condition, ahead of fitting day

  • Your bills, to match the battery to the hours you use power

About four in five households across New Mills East and West heated with mains gas alone at the 2021 Census.

When that boiler wears out, a heat pump can join the panels and battery in our full renewables package. We open up the wiring once for all three.

Four Figures Behind A New Mills Solar Quote

What goes into your paperwork, plus the rate that values each unit the house uses.

  • 26.32p
    The price-cap rate for a unit of electricity, October to December 2026. Each unit of panel output your house uses, at the time or later from the battery, is one you don’t buy at that rate
  • 2 years
    Our workmanship guarantee on the install
  • 70%
    The share of battery capacity guaranteed when its product warranty, at least 10 years long and registered to you, runs out
  • About a week
    On site for panels and a battery together; a battery alone takes a day

Solar Questions To Settle Before Your New Mills Survey

Shared roofs, gas boilers, existing panels and grey days.

Illustration of the clay-tiled roof of a red-brick detached house, before the solar panels are fittedIllustration of ten all-black solar panels fitted on rails on the clay-tiled roof of a red-brick detached house.Visualisation
Visualisation of a typical solar panel installation on a red-brick detached house. Not footage of a real job.
  • Our terrace shares a roofline with next door. Can we still have panels?

    Yes, on your own part of the roof. We keep the array on your side and work the layout around your chimney.

  • Is a battery worth it while we still heat with gas?

    That turns on how much power you use after dark and the tariff you’re on. The battery stores what the panels make in the day for the evening, and your quote shows the numbers for your house.

  • Can you fit a battery to the panels we already have?

    Yes. Tell us the make of your system and we match a battery to it; on some systems that means a compatible make in place of SolarWatt.

  • Do panels earn their keep on a grey New Mills day?

    They keep generating under cloud at a lower output. At the roof check we turn that into figures for your usage before you decide.

New Mills Solar And Battery Questions, Answered Before The Survey

Yes. The survey, the install and any return visit all start inside the town, and we cover Hayfield, Disley and the rest of the High Peak too.

About a week on site once the design and the price are agreed. A battery added to panels you already have is a one-day job.

Roof panels need no application in most cases, because the planning rules treat them as permitted development even in a conservation area. A listed building needs consent, and a flat roof needs prior approval, so the survey checks your address first, and we fit once any permission is granted.

In a dry, ventilated spot we agree with you at the survey. The design fixes the position and the cable route to the panels and your consumer unit.

Yes. Tell us at the survey and we leave room in the wiring and the battery sizing for a heat pump to join the system.

We do, with our install partner. Larger systems need the operator’s approval before fitting, and we apply at the design stage; smaller ones need a notice once they are running, which we send.

Tell Us About Your New Mills Roof

Your address, what you want the panels and battery to do, and a number we can reach you on. Our office comes back with a survey date.

We reply within one working day; the office is staffed 9am to 3pm on weekdays.

What Customers Around New Mills Say About First Point